6705  NUMBER 1 END OF KNOWLEDGE TEST

6705 NUMBER 1 END OF KNOWLEDGE TEST

Professional Development

20 Qs

quiz-placeholder

Similar activities

Role of Civil Engineers In Construction Industry

Role of Civil Engineers In Construction Industry

University - Professional Development

15 Qs

Make up

Make up

Professional Development

17 Qs

Laying the first brick

Laying the first brick

12th Grade - Professional Development

15 Qs

M51_Activity 1

M51_Activity 1

Professional Development

20 Qs

D44 QUIZ OF THE DAY

D44 QUIZ OF THE DAY

Professional Development

25 Qs

CAPAIAN PEMBELAJARAN

CAPAIAN PEMBELAJARAN

Professional Development

15 Qs

Bricklaying Construction Technologies

Bricklaying Construction Technologies

11th Grade - Professional Development

22 Qs

DW Dishwashers 2021

DW Dishwashers 2021

10th Grade - Professional Development

20 Qs

6705  NUMBER 1 END OF KNOWLEDGE TEST

6705 NUMBER 1 END OF KNOWLEDGE TEST

Assessment

Quiz

Professional Development

Professional Development

Hard

Created by

John Power

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What drawing should be used to show the external horizontal dimensions of a garage?

Front elevation.

Location plan.

Plan view.

Section through.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which scale is commonly used for elevation drawings?

1:5

1:100

1:250

1:2500

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which item of equipment would be used to measure angles when producing drawings?

Protractor.

Scale rule.

T square.

Set square.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What colour on a drawing identifies underground cold water supply pipes?

Green.

Blue.

Red.

Black.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which task should be completed before setting out a building?

Remove the topsoil.

Inform the builder’s merchants.

Order the ready mix concrete.

Check the site is level.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which method is used to check the building is square when setting out?

Check the external dimensions.

Check the internal dimensions.

Check the diagonal lengths.

Check the position of the profiles.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is the 3: 4: 5 method used when setting out?

To check the depth of excavation.

To keep the trench level.

To establish the right angles.

To form a profile board.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?