Sill and Floor Construction

Sill and Floor Construction

10th Grade

21 Qs

quiz-placeholder

Similar activities

drawings

drawings

10th - 12th Grade

19 Qs

PLTW-CEA-2.1.1-2.1.2

PLTW-CEA-2.1.1-2.1.2

10th - 12th Grade

21 Qs

TLE reviewer

TLE reviewer

9th - 12th Grade

18 Qs

(15) Hour Blueprint Reading Test

(15) Hour Blueprint Reading Test

9th - 12th Grade

20 Qs

Commercial Roofs/Walls

Commercial Roofs/Walls

9th - 12th Grade

20 Qs

CEA Unit 1 Review

CEA Unit 1 Review

9th - 12th Grade

20 Qs

Roller Coasters

Roller Coasters

KG - 12th Grade

17 Qs

Properties of Steel

Properties of Steel

KG - University

20 Qs

Sill and Floor Construction

Sill and Floor Construction

Assessment

Quiz

Architecture

10th Grade

Hard

Created by

Robert Gonzales

FREE Resource

21 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main benefit of using platform framing in construction?

It is easy and fast to construct.

It is more expensive.

It requires more materials.

It is more stable.

Answer explanation

The main benefit of platform framing is that it is easy and fast to construct, allowing for quicker building processes compared to other methods. This efficiency makes it a popular choice in modern construction.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The lowest member of the frame of a structure, which rests on the foundation and supports the floor joists and wall studs, is the ____.

sill

header beam
floor joist
foundation slab

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the role of the header in a box sill construction?

To support the floor joists

To provide insulation

To act as a decorative element

To serve as a fire-stop

Answer explanation

The header in a box sill construction is crucial as it supports the floor joists, ensuring structural integrity. This support is essential for distributing loads and maintaining stability in the building framework.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is required between the foundation and sill plate in construction?

Insulation

Seal

Paint

Metal plate

Answer explanation

A seal is required between the foundation and sill plate to prevent moisture intrusion and air leaks, ensuring a stable and energy-efficient structure. This is crucial for maintaining the integrity of the building.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of sill construction is used in balloon framing?

Solid (standard) sill or T-sill

Metal sill or plastic sill

Insulated sill or non-insulated sill

Wooden sill or concrete sill

Answer explanation

In balloon framing, a solid (standard) sill or T-sill is used to support the vertical framing members. This type of sill provides a strong base for the structure, making it the correct choice.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The actual dimensions of a 2" x 6" framing member are_

2" x 4"
1.5" x 5.5"
1.5" x 6"
3" x 6"

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The floor of a house is supported by _ or trusses

balloon frames

joists

beams
pillars

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?