In any software development life cycle model, there are several characteristics of good testing.
i. For every development activity, there is a corresponding test activity.
ii. For every development activity, there is no corresponding test activity.
iii. Each test level has test objectives specific to that level.
iv. Test analysis and design for a given test level begin during the corresponding development activity.
v. Testers participate in discussions to define and refine requirements and design, and are involved in reviewing work products.
Which of the above are characteristics of good testing?
chapter 02 - P1

Quiz
•
English
•
University
•
Medium
NguyễnThịKimNgọc_DTH205892 _DH21TH2
Used 1+ times
FREE Resource
46 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
i, ii, and iii are correct, iv, v are false
i, ii, and iv are correct, ii, v are false
i and iii are correct, ii, iv, v are false
iii, iv, and v are correct, ii are false
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When should testers start reviewing project documents?
After development is done
When they have been baselined and approved
When the developers have started coding
As soon as a draft is available
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which development model describes the software development process as a linear?
Iterative model
Sequential Model
Incremental Model
V Model
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which development model is implementing the principle of early testing?
V model
Waterfall model
Iterative model
Spiral model
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In ......................, test activities only occur after all other development activities have been completed; While in .................... the execution of tests associated with each test level proceeds sequentially.
Waterfall model, V model
V model, Waterfall
Sequential model, Incremental model
Incremental model, Sequential model
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Incremental development involves establishing requirements, designing, building, and testing a system in pieces.
True
False
Not sure
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Map the Iterative development examples with the best answer:
1- Rational Unified Process
2- Scrum
3- Kanban
4- Spiral
i. Implemented with or without fixed-length iterations.
ii. Each iteration tends to be relatively long.
iii. Involves creating experimental increments.
iv. Each iteration tends to be relatively short.
v. Feature increments are correspondingly large.
vi. Feature increments are correspondingly small
1 = ii and vi; 2 = iv and v; 3 = i; 4 = iii
1 = ii and v; 2 = iv and vi; 3 = i; 4 = iii
1 = iv and vi; 2 = ii and v; 3 = i; 4 = iii
1 = iv and vi; 2 = i and v; 3 = ii ; 4 = i
Create a free account and access millions of resources
Similar Resources on Wayground
51 questions
MKT 251H

Quiz
•
University
47 questions
Inclusive Education and E-Learning Quiz

Quiz
•
University
41 questions
Linguistics

Quiz
•
University
50 questions
PARTS OF SPEECH

Quiz
•
University
42 questions
Culture and Heritage Quiz

Quiz
•
8th Grade - University
45 questions
Ict1

Quiz
•
University
45 questions
STAAR Review 2025

Quiz
•
7th Grade - University
50 questions
Professional Software Development Quiz

Quiz
•
University
Popular Resources on Wayground
25 questions
Equations of Circles

Quiz
•
10th - 11th Grade
30 questions
Week 5 Memory Builder 1 (Multiplication and Division Facts)

Quiz
•
9th Grade
33 questions
Unit 3 Summative - Summer School: Immune System

Quiz
•
10th Grade
10 questions
Writing and Identifying Ratios Practice

Quiz
•
5th - 6th Grade
36 questions
Prime and Composite Numbers

Quiz
•
5th Grade
14 questions
Exterior and Interior angles of Polygons

Quiz
•
8th Grade
37 questions
Camp Re-cap Week 1 (no regression)

Quiz
•
9th - 12th Grade
46 questions
Biology Semester 1 Review

Quiz
•
10th Grade