Structural Coverings and Finishes Practice

Structural Coverings and Finishes Practice

11th Grade

36 Qs

quiz-placeholder

Similar activities

INI 3101- TEST 4 REVIEW

INI 3101- TEST 4 REVIEW

11th Grade - Professional Development

34 Qs

PTCB Sterile Compounding/Aseptic Technique

PTCB Sterile Compounding/Aseptic Technique

9th - 12th Grade

40 Qs

Worksheet 01

Worksheet 01

1st Grade - University

34 Qs

1.01 - 1.02 MMWD Review

1.01 - 1.02 MMWD Review

9th - 12th Grade

41 Qs

Customer Service Chapter 2 Review

Customer Service Chapter 2 Review

9th - 12th Grade

32 Qs

Anatomical Positions & Planes of Motion

Anatomical Positions & Planes of Motion

11th - 12th Grade

36 Qs

Python Basics 2

Python Basics 2

5th Grade - Professional Development

36 Qs

ECE Exam Review #1

ECE Exam Review #1

11th - 12th Grade

39 Qs

Structural Coverings and Finishes Practice

Structural Coverings and Finishes Practice

Assessment

Quiz

Professional Development

11th Grade

Practice Problem

Hard

Created by

Adam Geaslen

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

36 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which tool is most likely to cause injury to an operator who has long hair that is not pulled back or secured?

Drill press

Aluminum brake

Pneumatic nailer

Reciprocating saw

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The greater the R value, the greater the ________ value.

insulation

temperature

pressure

density

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which entity is responsible for enforcing standards and providing training, outreach, education, and assistance to protect employees in the workplace?

Occupational Safety and Health Administration

Ohio State Health Advisors

Organization of Safety and Health Administrators

Occupational Safety and Health Association

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

You are installing 1/2" drywall on one wall that measures 8' x 25'. How many 4' x 8' sheets should you order?

6

7

32

200

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

You need to install vinyl siding on a house and the HVAC line is being replaced. You are going to use a circular saw with a 25' cord to cut siding. What PPE should you wear for this job site?

Hard hat, hearing protection, and respirator

Safety glasses, rubber gloves, and steel-toed boots

Hearing protection, safety glasses, and respirator

Hard hat, hearing protection, and safety glasses

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

You are laying wood flooring in a room 10' by 15' rectangular room with 8' walls. What is the square footage of the floor in this room?

148 sq. ft.

150 sq. ft.

168 sq. ft.

180 sq. ft.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is most important when installing drywall with screws?

Screw head is slightly above drywall level

Screw head is slightly below drywall level

Screw head is driven at an angle

Screw head is flush with the drywall

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Professional Development