Kuis Sampling Minyak

Kuis Sampling Minyak

Professional Development

•

46 Qs

quiz-placeholder

Similar activities

Terik's Practice Test 4

Terik's Practice Test 4

Professional Development

•

42 Qs

Soal PPPK

Soal PPPK

Professional Development

•

46 Qs

TRY OUT PPPK 1

TRY OUT PPPK 1

Professional Development

•

50 Qs

SELASAR W1 JULY

SELASAR W1 JULY

Professional Development

•

50 Qs

BUSINESS ENGLISH COLLOCATIONS ( DO - MAKE - TAKE)

BUSINESS ENGLISH COLLOCATIONS ( DO - MAKE - TAKE)

Professional Development

•

46 Qs

REASONING_QUIZ

REASONING_QUIZ

University - Professional Development

•

42 Qs

[AZ-900] 03 - Gerenciamento  e Governança

[AZ-900] 03 - Gerenciamento e Governança

Professional Development

•

41 Qs

Terik's Practice Test 2

Terik's Practice Test 2

Professional Development

•

42 Qs

Kuis Sampling Minyak

Kuis Sampling Minyak

Assessment

Quiz

•

Professional Development

•

Professional Development

•

Practice Problem

•

Hard

Created by

Aldi ansyah

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

46 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which hardware is best for sampling pressure channels above 500 psi?

A long dead-leg of pipe with a plug at the end

A pressure regulating valve or a coiled helix connected to a mini-mess valve

A closed drain plug

A mini-mess valve located at a bend

A mini-mess valve located in a straight length of pipe

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A vacuum sampler is needed:

In low-pressure lines

From non-pressurized wells

From pressurized lines

Answer a and b

All of the above

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Sampling of non-circulating splash/bath well should be done by:

Removing the Drain Plug

Using a flexible drop vacuum tube sample

Using a flexible drop vacuum tube sample from the bottom of the well

Obtaining a sample from the middle oil level of a rigid tube fixed inside the well

This system should not be sampled

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Sampling vacuum tube falling from the reservoir and tank should be done:

From the bottom of the tank

Where the oil return line drains back to the tank

Where the suction line draws oil from the tank

From the top layer of oil in the tank where water and dirt have settled

From the middle of the tank

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For typical hydraulic fluid, how full should the sample bottle be filled with hydraulic fluid?

50%

75%

90%

100%

Doesn't matter

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The sampling frequency of oil can be influenced by:

Machine age

Machine criticality

Fluid (oil) age

Operating conditions

All of the above

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The common sampling frequency for industrial oil is:

Every two weeks

Monthly (500 to 1,000 hours)

Quarterly

Every six months

Yearly

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?