Ph 3 Mock

Ph 3 Mock

Professional Development

20 Qs

quiz-placeholder

Similar activities

Part 6- INTERNATIONAL MECHANICAL CODE

Part 6- INTERNATIONAL MECHANICAL CODE

Professional Development

16 Qs

2018 IFGC CH 5A Study Quiz

2018 IFGC CH 5A Study Quiz

Professional Development

25 Qs

Gas Regs Part C and D Worksheet 2 (using BPEC book)

Gas Regs Part C and D Worksheet 2 (using BPEC book)

Professional Development

15 Qs

Re-establishing gas supplies

Re-establishing gas supplies

Professional Development

23 Qs

Carpet

Carpet

Professional Development

20 Qs

Characteristics of Combustion work sheet 1

Characteristics of Combustion work sheet 1

Professional Development

20 Qs

July 3

July 3

Professional Development

20 Qs

Basic terminology

Basic terminology

Professional Development

20 Qs

Ph 3 Mock

Ph 3 Mock

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

Ben Ashford

Used 2+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An air source heat pump works on which of the following principles?

Cold exchange.

Electromagnetic induction.

Refrigeration cycle.

Otto cycle.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How do the installation costs of a ground source heat pump compare to the installation costs of an air source heat pump?

There is no difference in the installation costs or disruption to the customer

The costs and disruption to the customer are greater with an air source heat pump

The costs and disruption to the customer are greater with a ground source heat pump

There is only a slight difference in costs and no disruption to the customer

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which statement is correct for a 'permitted development' under town and country planning regulations with regard to solar thermal?

The installation can commence without the need for planning permission.

The installation requires planning permission before work commences.

A Building Control Officer must inspect the work.

MCS registration is mandatory.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following lists contains only technologies that are classed as Micro-renewable energy sources?

Solar thermal, heat pumps, greywater re-use.

Solar thermal, heat pumps, rainwater harvesting.

Heat Pumps, solar thermal, biomass.

Biomass, solar thermal, rainwater harvesting.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which regulatory body governs installations using Oil?

OFTEC.

HETAS.

GISUR.

MCS.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is a requirement for the fuel storage within a biomass boiler house, according to Building regulations Part J?

Biomass fuel cannot be stored in the boiler house.

A carbon monoxide (CO) monitor is required.

A smoke alarm is required.

A heat sensor is required.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following factors affect the selection of a fuel?

Availability, Fuel Storage Requirements, Appliance Type

Installer availability, British Standards, Merchant locality, Water Regulations

Gas Safe Registration, Gas installation and Use Regulations, Electricity at Work Regulations

Water Regulations, Gas installation and Use Regulations, Electricity at Work Regulations

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?