Building Works Assessment

Building Works Assessment

Professional Development

10 Qs

quiz-placeholder

Similar activities

El Ingeniero Supremo

El Ingeniero Supremo

Professional Development

9 Qs

Zero Trust Management

Zero Trust Management

Professional Development

15 Qs

RCC VEDA

RCC VEDA

Professional Development

10 Qs

Quality Control Fundamentals in Infrastructure Projects

Quality Control Fundamentals in Infrastructure Projects

Professional Development

10 Qs

HIGHWAY ENGINEERING (DIPLOMA/BTECH)

HIGHWAY ENGINEERING (DIPLOMA/BTECH)

Professional Development

5 Qs

Maintenance of Roads and Bridges, Project Quality Assurance DPWH

Maintenance of Roads and Bridges, Project Quality Assurance DPWH

Professional Development

10 Qs

THAY ĐỔI TUẦN 2 NGÀY 11.04

THAY ĐỔI TUẦN 2 NGÀY 11.04

Professional Development

10 Qs

Evaluación capitulo 4

Evaluación capitulo 4

Professional Development

11 Qs

Building Works Assessment

Building Works Assessment

Assessment

Quiz

Engineering

Professional Development

Hard

Created by

henry njambutu

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

1. What is the main purpose of setting out a building?

A. To dig the foundation

B. To lay block

C. To transfer design from drawing to the ground

D. To pour concrete

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

2. What is the first step in the construction process after obtaining the necessary permits?

A. Begin framing

B. Clear the site

C. Install plumbing

D. Pour the foundation

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

3. Which tool is primarily used for measuring distances on a construction site?

A. Level

B. Tape measure

C. Square

D. Hammer

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

4. What is the purpose of a building's blueprint?

D. To select materials

C. To outline the construction schedule

B. To provide a visual representation of the design

A. To estimate costs

5.

OPEN ENDED QUESTION

3 mins • 1 pt

  1. 5. which type of foundation is best for storey buildings?

Evaluate responses using AI:

OFF

6.

FILL IN THE BLANK QUESTION

1 min • 1 pt

  1. 6. we use _____ level for determining elevation of places.

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

7. Which personal protective equipment (PPE) is most important when mixing concrete manually?

A. Safety boot

B. Helmet

C. Ear muffs

D. Welding mask

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?