Quiz SIMPRO 2.0 PK-OP

Quiz SIMPRO 2.0 PK-OP

Professional Development

15 Qs

quiz-placeholder

Similar activities

Instalasi RAC - Non Inverter

Instalasi RAC - Non Inverter

KG - University

10 Qs

X TKJ

X TKJ

10th Grade

20 Qs

PK XD

PK XD

KG - Professional Development

10 Qs

Prosedur Operasional Bank

Prosedur Operasional Bank

University

10 Qs

UH Operasi Teknik Kimia (Startup & Shutdown)

UH Operasi Teknik Kimia (Startup & Shutdown)

11th Grade

15 Qs

MODULE 1 : PK AUDIT TRAINING

MODULE 1 : PK AUDIT TRAINING

Professional Development

11 Qs

KAWALAN DALAMAN PEROLEHAN

KAWALAN DALAMAN PEROLEHAN

Professional Development

10 Qs

IT Kelas 7

IT Kelas 7

7th Grade

10 Qs

Quiz SIMPRO 2.0 PK-OP

Quiz SIMPRO 2.0 PK-OP

Assessment

Quiz

Other

Professional Development

Hard

Created by

PK OP

Used 5+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Proses kerja operasi (PK-OP) terdiri atas 3 proses kerja yakni :

PK-Shutdown, PK-Start Up dan PK-Turn Around

PK-Start Up, PK-Shutdown dan PK-Normal Operasi

PK-Start Up, PK-Preventive Maintenance dan PK-Normal Operasi

Tidak ada jawaban yang benar

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Tujuan umum dari proses kerja start-up (PK-Start Up) yang paling tepat adalah?

Meminimalkan kegagalan proses start up

Meminimalkan konsumsi energi saat proses start-up

Meminimalkan kerusakan alat saat proses start

Optimalisasi durasi dan biaya

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Pada saat serah terima pabrik pasca program Turn Around untuk persiapan/proses start-up maka alur proses kerja yang tepat adalah?

P-HAR-05 Managemen Turn Around & Proses Kerja Start Up (PK-SU)

P-HAR-30 Management Shutdown & Proses Kerja Normal Operasi (PK-NO)

P-HAR-05 Management Shutdown Item & Proses Kerja Start Up (PK-SU)

P-HAR-30 Management Pemeliharaan Pabrik & Proses Kerja Start Up (PK-SU)

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Proses kerja Operasi mempunyai 3 buah Key Performance Indicator (KPI) yakni?

Plant Shutdown Item, Shutdown Duration, Start Up Duration

Plant Turn Around, Shutdown Energy, Shutdown Duration

Plant Availability/RKAP Prod, Shutdown Duration, Start Up Duration

Plant Availability/Pencapaian Produksi, OEE, Start Up Duration

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Pada tahapan perencanaan proses start-up, dokumen pendukung terkait yang digunakan yang paling tepat adalah?

Barchart start-up, List PM/PdM, Instruksi Kerja Normal/Hot Start-Up

Evaluasi Start-Up sebelumnya, Barchart start up, Instruksi Kerja Normal/Hot StartUp, PSSR, dan Berita Acara Confined Space

Evaluasi Pelaksanaan TA, Barchart start up, Instruksi Kerja Normal/Hot StartUp

Barchart start-up, List bypass interlock, Instruksi Kerja Normal/Hot Start-Up

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Pada saat tahaan normal start up pabrik, tahapan penormalan interlock yang paling tepat dan aman bagi peralatan/operator adalah sebagai berikut?

Penormalan interlock sesuai/mengikuti tahapan start up alat/unit proses  tidak menunggu rate pabrik normal 100%

Penormalan semua interlock menunggu rate pabrik normal 100%

Penormalan semua interlock menunggu order pihak instrumen

Jawaban a,b dan c benar semua

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Pada proses kerja normal operasi, pada saat ditemukan abnormal/kerusakan peralatan maka harus dibuatkan notifikasi / work request oleh pihak operasi melalui SAP?

Notifikasi M4 Corrective Maintenance

Notifikasi M3 Corrective Maintenance

Notifikasi M1 Corrective Maintenance

Notifikasi M2 Corrective Maintenance

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?