1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How many and what types of substations are included in the Shah Alam Line's 132kV Bulk Supply System?
2 BSS, 1 SSU, 18 TPSS, 7 RS, 2 LVSS
3 BSS, 2 SSU, 16 TPSS, 5 RS, 3 LVSS
2 BSS, 1 SSU, 20 TPSS, 6 RS, 2 LVSS
1 BSS, 1 SSU, 18 TPSS, 7 RS, 2 LVSS
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Under which condition will the No-Volt Automatic Changeover (NVAC) Scheme be initiated?
When total power loss occurs at BSS or SSU
During any minor voltage fluctuation in the 33kV system
Under single failure condition of BSS equipment or outgoing feeder to 33kV network at BSS
When power supply increases above 110% of nominal voltage
Answer explanation
The initiation of NVAC Scheme will only apply under single failure condition of BSS equipment, or outgoing
feeder to 33kV network at BSS to reduce the complexity and minimizing the operation risk.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following statements about the NVAC Scheme is true?
NVAC will be triggered during total power loss at the BSS
NVAC will automatically restore power through permanent genset
NVAC operates through manually controlled switches only
NVAC will not initiate if power drops below 50% for less than 3 seconds
Answer explanation
When incoming power supply drops below 50% of the nominal voltage for more than 3s, the NVAC shall be initiated.
(it will be coordinated so that NVAC will do the power restoration before permanent genset)
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the main function of the Load Break Switch?
To increase power supply
To monitor voltage levels
To provide emergency power
To connect or isolate two power rail sections
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What happens when a BLS plunger is activated?
It sends a wireless signal to the station operator for manual shutdown
It energizes the 110V DC trip circuit to open the BLS door
It cuts off the 110V DC trip circuit and triggers the BLRP to trip the DC Feeder Breaker
It automatically resets the BLS and re-energizes the power rail
Answer explanation
Each activated BLS plunger will cut off 110V DC normally energized trip circuit. The trip circuit, comprising one BLS plunger, will be wired to the Blue Light Relay Panel (BLRP) at TPSS.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following signals are sent from the BLS to SCADA?
BLS Temperature Alarm and BLS Maintenance Status
BLS Tripping Signal and BLS Door Open
BLS Reset Confirmation and BLS Voltage Status
BLS Activation Timer and BLS Location Update
Answer explanation
Each BLS will send 2nos of IO signal to SCADA which are:
a) BLS Tripping Signal
b) BLS Door Open
7.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
What are the requirements that must be fulfilled in order to close a CIS?
Bustie closed
F1 and F2 closed
F1 and F3 closed
F2 and F4 closed
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?