POWER SYSTEM

POWER SYSTEM

Professional Development

13 Qs

quiz-placeholder

Similar activities

Nhanh tay, nhanh trí cùng BSS

Nhanh tay, nhanh trí cùng BSS

1st Grade - Professional Development

10 Qs

Fungsi 2&3 - Alat Pembatas dan Pengukur

Fungsi 2&3 - Alat Pembatas dan Pengukur

Professional Development

10 Qs

hyper omni

hyper omni

KG - Professional Development

11 Qs

Avengers infinity war

Avengers infinity war

KG - Professional Development

16 Qs

OKAY KE TU?? 🤪

OKAY KE TU?? 🤪

Professional Development

13 Qs

Common Game Knowledge

Common Game Knowledge

1st Grade - Professional Development

15 Qs

highschool dxd harder

highschool dxd harder

6th Grade - Professional Development

12 Qs

TEST TWO

TEST TWO

9th Grade - Professional Development

10 Qs

POWER SYSTEM

POWER SYSTEM

Assessment

Quiz

Other

Professional Development

Medium

Created by

Nurin Afiqah

Used 1+ times

FREE Resource

13 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many and what types of substations are included in the Shah Alam Line's 132kV Bulk Supply System?

2 BSS, 1 SSU, 18 TPSS, 7 RS, 2 LVSS

3 BSS, 2 SSU, 16 TPSS, 5 RS, 3 LVSS

2 BSS, 1 SSU, 20 TPSS, 6 RS, 2 LVSS

1 BSS, 1 SSU, 18 TPSS, 7 RS, 2 LVSS

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Under which condition will the No-Volt Automatic Changeover (NVAC) Scheme be initiated?

When total power loss occurs at BSS or SSU

During any minor voltage fluctuation in the 33kV system

Under single failure condition of BSS equipment or outgoing feeder to 33kV network at BSS

When power supply increases above 110% of nominal voltage

Answer explanation

The initiation of NVAC Scheme will only apply under single failure condition of BSS equipment, or outgoing

feeder to 33kV network at BSS to reduce the complexity and minimizing the operation risk.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following statements about the NVAC Scheme is true?

NVAC will be triggered during total power loss at the BSS

NVAC will automatically restore power through permanent genset

NVAC operates through manually controlled switches only

NVAC will not initiate if power drops below 50% for less than 3 seconds

Answer explanation

When incoming power supply drops below 50% of the nominal voltage for more than 3s, the NVAC shall be initiated.

(it will be coordinated so that NVAC will do the power restoration before permanent genset)

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main function of the Load Break Switch?

To increase power supply


To monitor voltage levels

To provide emergency power

To connect or isolate two power rail sections

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What happens when a BLS plunger is activated?

It sends a wireless signal to the station operator for manual shutdown

It energizes the 110V DC trip circuit to open the BLS door

It cuts off the 110V DC trip circuit and triggers the BLRP to trip the DC Feeder Breaker

It automatically resets the BLS and re-energizes the power rail

Answer explanation

Each activated BLS plunger will cut off 110V DC normally energized trip circuit. The trip circuit, comprising one BLS plunger, will be wired to the Blue Light Relay Panel (BLRP) at TPSS.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following signals are sent from the BLS to SCADA?

BLS Temperature Alarm and BLS Maintenance Status

BLS Tripping Signal and BLS Door Open

BLS Reset Confirmation and BLS Voltage Status

BLS Activation Timer and BLS Location Update

Answer explanation

Each BLS will send 2nos of IO signal to SCADA which are:
a) BLS Tripping Signal
b) BLS Door Open

7.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

What are the requirements that must be fulfilled in order to close a CIS?

Bustie closed

F1 and F2 closed

F1 and F3 closed

F2 and F4 closed

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?