Round 1_GIB

Round 1_GIB

Professional Development

30 Qs

quiz-placeholder

Similar activities

What Logo Is This?

What Logo Is This?

KG - Professional Development

35 Qs

general knowledge

general knowledge

Professional Development

30 Qs

Cheslyn 17th Birthday

Cheslyn 17th Birthday

Professional Development

25 Qs

Fast Track Electrical Week 1 Review

Fast Track Electrical Week 1 Review

Professional Development

31 Qs

Famous Buildings JEE Paper - 2

Famous Buildings JEE Paper - 2

7th Grade - Professional Development

25 Qs

Basic 1

Basic 1

Professional Development

25 Qs

Pokemon

Pokemon

KG - Professional Development

26 Qs

multiple choice 2016

multiple choice 2016

KG - Professional Development

25 Qs

Round 1_GIB

Round 1_GIB

Assessment

Quiz

Other

Professional Development

Easy

Created by

Athyra Latif

Used 2+ times

FREE Resource

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

Before starting any maintenance work on a piece of equipment, any source of energy must be safely _________.
tagged
transformed
isolated
sold

Answer explanation

The source of energy must be safely isolated to ensure the equipment where maintenance work is being carried out has zero energy

2.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

What is the primary goal of process safety?
Improve employee satisfaction
Prevent unplanned releases of hazardous materials
Increase production speed
Reduce paperwork

Answer explanation

x

3.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

What is GC mantra that we should live up to?
Doing the right things right even when one is watching
Doing the right things right even when no one is watching
Doing the right things right when one is watching

4.

MULTIPLE CHOICE QUESTION

10 sec • 1 pt

When is the target for PETRONAS to achieve Generative level in HSE Culture Maturity? When is the target for PETRONAS to achieve Generative level in HSE Culture Maturity?
2028
2030
2032
2035

Answer explanation

Generative HSE Culture move PETRONAS organization towards HSE Excellence, per our quest to achieve our aspiration in zero incidents.Our Goal is to achieve Generative HSE Culture by 2030

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The following information is not included in the Safety Data Sheet (SDS) of chemicals.
How the chemical was manufactured or produced
Flammability and other physical hazards
Possible health effects
What is to be done if the material is spill or ignited

Answer explanation

How the chemical was manufactured or produced is information not required to be in the SDS

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Return To Work (RTW) health assessment shall be triggered for employee or contractor worker who was away from work due to the following reasons, except
Serious injury/injuries
Post medical evacuation/ repatriation
Serious illness
Post maternal leave

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which of the following is NOT a responsibility of Floor Safety Managers or Fire Wardens in an office environment?
Updating building occupancy lists
Participating in HSSE walkabouts in their assigned areas
Assisting occupants during building evacuation
Ensure the safety and health of visitors to the workplaces.

Answer explanation

Floor Safety Managers and Fire Wardens focus on the safety of employees in their area—like helping during emergencies, doing safety walkabouts, and updating the occupancy list. Making sure visitors are safe is usually the job of security or overall site management, not the main duty of Floor Safety Managers.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?