Construction Delivery Methods Quiz

Construction Delivery Methods Quiz

University

22 Qs

quiz-placeholder

Similar activities

แบบทดสอบหลังอบรม

แบบทดสอบหลังอบรม

University

20 Qs

Quiz on Operational Definitions and Research Design

Quiz on Operational Definitions and Research Design

University

20 Qs

HTML Revision

HTML Revision

KG - Professional Development

20 Qs

Speaking Types

Speaking Types

University

17 Qs

FIRE PROTECTION SYSTEM

FIRE PROTECTION SYSTEM

University

20 Qs

Design of RCC and Steel Structures

Design of RCC and Steel Structures

University

20 Qs

Office Administrative 1

Office Administrative 1

University

20 Qs

QUIZ FOR PRELIM

QUIZ FOR PRELIM

University

20 Qs

Construction Delivery Methods Quiz

Construction Delivery Methods Quiz

Assessment

Quiz

Education

University

Practice Problem

Medium

Created by

Mohd Ansori

Used 2+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

22 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the most common method of construction procurement?

Design-Bid-Operate Method

Modern Method

Design-Bid-Build Method

Design-Build Method

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who acts as the project coordinator in the Design-Bid-Build method?

Subcontractor

Architect or Engineer

Client

Main Contractor

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of subcontractor is selected directly by the main contractor?

Independent Subcontractor

Nominated Subcontractor

Domestic Subcontractor

Client Subcontractor

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the Design-Bid-Build method, who bears all risks associated with the domestic subcontractor?

Client

Nominated Contractor

Main Contractor

Subcontractor

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a key advantage of the Design-Bid-Build method?

Less owner control

Limited competition

Clear separation of roles

Faster delivery

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a disadvantage of the Design-Bid-Build method?

Cost certainty

Adversarial relationships

Higher upfront cost

Fewer disputes

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first stage in the traditional construction process?

Handover stage

Construction stage

Design stage

Tender stage

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?