
Surveying I Quiz
Authored by Chamod Hettiarachchi
Engineering
University
Used 11+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
What is the primary objective of surveying in civil engineering projects?
To register property boundaries
To determine relative positions of points and represent them in usable forms
To calculate project costs
To design structural components
2.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
Which type of surveying considers the Earth as flat over small areas?
Geodetic surveying
Astronomical surveying
Plane surveying
Hydrographic surveying
3.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
Which principle ensures accuracy by establishing control before detailing in surveying?
Part to the whole
Local adjustment
Whole to the part
Triangulation method
4.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
What is the only method available for precise vertical control in surveying?
Compass surveying
Plane tabling
Levelling
GPS surveying
5.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
In which method are only angular measurements used to fix a point?
Traverse
Trilateration
Triangulation
Chain survey
6.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
Which of the following instruments is used to measure both angles and distances electronically?
Compass
Level
Theodolite
Total Station
7.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
Which type of error in surveying is caused by human mistakes like misreading or misbooking?
Blunder
Systematic error
Random error
Instrumental error
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?