SITE PRELIMINARY

SITE PRELIMINARY

Vocational training

17 Qs

quiz-placeholder

Similar activities

Level 2 Cold Water Plumbing Exam [QUIZ 1]

Level 2 Cold Water Plumbing Exam [QUIZ 1]

12th Grade - University

20 Qs

What is substructure (4)

What is substructure (4)

Professional Development

16 Qs

Construction Safety and Techniques Quiz

Construction Safety and Techniques Quiz

9th - 12th Grade

20 Qs

KUIS 4 MANAJEMEN PROYEK KONSTRUKSI

KUIS 4 MANAJEMEN PROYEK KONSTRUKSI

University

15 Qs

Estimasi

Estimasi

11th Grade

20 Qs

Hazardous Substances

Hazardous Substances

KG - University

18 Qs

Quiz 7.  Manual Handling and Ergonomics

Quiz 7. Manual Handling and Ergonomics

KG - University

15 Qs

Understanding Construction Safety Signs

Understanding Construction Safety Signs

12th Grade - University

15 Qs

SITE PRELIMINARY

SITE PRELIMINARY

Assessment

Quiz

Construction

Vocational training

Practice Problem

Hard

Created by

Mwangi Lee

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

17 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. Which of these survey equipment is primarily used to measure horizontal and vertical angles accurately?

  • Compass

Theodolite

  • Tape measure

  • Hammer

2.

FILL IN THE BLANK QUESTION

1 min • 1 pt

  1. The ________________ is the topographic and physical condition report of the site prepared after the preliminary survey.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. What instrument is commonly used for measuring distances in surveying?

  • Protractor

  • Caliper

  • Level

Measuring wheel

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. Which tool is essential for establishing a level reference point in construction?

  • Laser rangefinder

  • Plumb bob

Surveying rod

  • Spirit level

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. What device is used to determine the elevation of a point relative to a reference level?

  • Barometer

Altimeter

  • GPS receiver

  • Clinometer

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. Which of the following is NOT typically included in a preliminary site survey report?

  • Site boundaries and location

  • Detailed interior building design

  • Soil conditions and topography

  • Existing utilities and environmental considerations

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

  1. Which of the following tools is primarily used for measuring angles in surveying?

  • Measuring tape

Transit

  • Surveying wheel

  • Clinometer

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?