12SE - 3.0.* - MCQ 2.1

12SE - 3.0.* - MCQ 2.1

12th Grade

•

47 Qs

quiz-placeholder

Similar activities

Credit and Loans

Credit and Loans

8th Grade - University

•

42 Qs

Pretest - Mechanical Drawing - Chapter 3

Pretest - Mechanical Drawing - Chapter 3

8th - 12th Grade

•

50 Qs

RBT T3 B1

RBT T3 B1

11th Grade - University

•

45 Qs

Class of Accounting

Class of Accounting

12th Grade

•

50 Qs

1. Bahasa Indonesia_XI.MIPA/XI.IPS

1. Bahasa Indonesia_XI.MIPA/XI.IPS

12th Grade

•

43 Qs

soal sasis

soal sasis

12th Grade

•

50 Qs

SAS QURDIS KELAS 7

SAS QURDIS KELAS 7

7th Grade - University

•

50 Qs

Module I: Understanding Operating Systems

Module I: Understanding Operating Systems

12th Grade - University

•

45 Qs

12SE - 3.0.* - MCQ 2.1

12SE - 3.0.* - MCQ 2.1

Assessment

Quiz

•

Other

•

12th Grade

•

Practice Problem

•

Easy

Created by

Andrew Connolly

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

47 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of defining the scope in a software project?

To determine the programming language used

To identify hardware requirements

To specify what the project will and will not include

To estimate the number of users

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is feasibility analysis important at the start of a project?

It defines user roles

It helps to assess whether the project can be realistically completed

It describes the user interface

It outlines licensing requirements

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is an example of a functional requirement?

The software must load within 2 seconds

The user interface must use dark mode

The system must allow users to reset their passwords

The database must contain fewer than 10,000 records

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following best describes a data structure?

A collection of styling instructions

A format for organising and storing data

A technique for validating input

A type of digital image

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of using a storyboard in planning a software project?

To estimate costs

To debug code

To visually design user interfaces and navigation

To manage user passwords

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What tool is used to describe the input, processing, and output of an algorithm?

UML diagram

Data dictionary

Pseudocode

Text editor

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a benefit of using a data dictionary in software development?

It optimises the user interface

It encrypts user data

It defines and standardises data used in the system

It stores images in a web app

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?