Practical Everyday Life Calculations in Construction

Practical Everyday Life Calculations in Construction

Vocational training

15 Qs

quiz-placeholder

Similar activities

Copper pipework CP-1

Copper pipework CP-1

KG - University

20 Qs

Year 5 Quiz: Maths and More

Year 5 Quiz: Maths and More

KG - University

20 Qs

K30 Fire door requirements

K30 Fire door requirements

KG - University

12 Qs

303 Scientific Principles Quiz

303 Scientific Principles Quiz

2nd Grade - University

20 Qs

Protective Devices Quiz

Protective Devices Quiz

KG - University

10 Qs

Site Preparation and pipework fabrication

Site Preparation and pipework fabrication

KG - University

11 Qs

Shower systems quiz Hot Water PowerPoint 5

Shower systems quiz Hot Water PowerPoint 5

KG - University

15 Qs

Critical Activities Identification Worksheet

Critical Activities Identification Worksheet

University

20 Qs

Practical Everyday Life Calculations in Construction

Practical Everyday Life Calculations in Construction

Assessment

Quiz

Construction

Vocational training

Hard

Created by

Kate Burrows

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the area of a floor or wall if its dimensions are 5m × 4m?

20m²

9m²

10m²

25m²

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a wall is 3m × 2.5m, what is the total area to be painted?

7.5m²

5.5m²

6.5m²

8.5m²

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the perimeter of a rectangular area with sides 6m and 4m?

20m

18m

24m

12m

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the volume of concrete needed for a space measuring 3m × 2m × 0.1m?

0.6m³

0.03m³

6m³

60m³

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How much soil needs to be removed from an excavation measuring 10m × 0.5m × 0.5m?

2.5m³

5m³

1.5m³

0.25m³

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the total material cost for 1,000 bricks if each brick costs £0.50?

£500

£250

£1000

£750

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many labour hours are required if 3 workers work 8 hours a day for 5 days?

120h

80h

100h

60h

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?