9289 Phase 1 - 302 (Pipework Joints Activity 4)

9289 Phase 1 - 302 (Pipework Joints Activity 4)

Vocational training

20 Qs

quiz-placeholder

Similar activities

Legislation and Standards

Legislation and Standards

12th Grade

15 Qs

Low Carbon Steel ppt2 Quiz

Low Carbon Steel ppt2 Quiz

KG - University

15 Qs

9289 Phase 1 - 302 (Tools and Power Tools Activity 2)

9289 Phase 1 - 302 (Tools and Power Tools Activity 2)

KG - University

20 Qs

HSE Class Test (Resit) SAQ

HSE Class Test (Resit) SAQ

KG - University

24 Qs

PPT 3 - Central heating systems installed in domestic dwellings

PPT 3 - Central heating systems installed in domestic dwellings

12th Grade - University

25 Qs

CORE 00109 Quiz

CORE 00109 Quiz

9th Grade

20 Qs

connecting pipes and fittings to appliances

connecting pipes and fittings to appliances

11th Grade

18 Qs

Rain Water

Rain Water

KG - University

21 Qs

9289 Phase 1 - 302 (Pipework Joints Activity 4)

9289 Phase 1 - 302 (Pipework Joints Activity 4)

Assessment

Quiz

Construction

Vocational training

Hard

Created by

Dale Taylor

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the benefits of forming pipework correctly during installation?

The installation looks good, water flows correctly, and the pipe can be supported sufficiently

The installation will be faster but less reliable

The pipe will be more expensive

The water will flow slower

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Consider a scenario where pipework is not formed correctly. What potential issues might arise in the plumbing system? (DoK Level 3)

The installation may look unprofessional, water flow may be disrupted, and pipes may lack sufficient support

The pipes will become more flexible

The water will become cleaner

The installation will be easier to repair

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When using a tube bender, where should you place the 4D mark?

On the ‘start of bend’ mark on the benders.

On the end of the tube.

On the fixed point.

On the set square.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What is the purpose of measuring back four diameters of the tube size before bending?

To ensure the bend starts at the correct position for an accurate 90° angle.

To make the tube longer.

To mark the end of the tube.

To check the tube for defects.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the offset measurement given in the example for a copper pipe offset bend?

25mm

100mm

50mm

75mm

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When measuring for a copper pipe offset bend, what should be deducted from the 600mm folding rule?

The pipe diameter

The size of the offset

The pipe length

The angle of the bend

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What is the purpose of repositioning the rule when creating a copper pipe offset bend?

To give the correct angle for the second bend.

To measure the length of the pipe.

To check the thickness of the pipe.

To mark the cutting point on the pipe.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?