1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of control plan?

The purpose of control plan methodology is to aid in the manufacture of quality products according to customer requirements

To define the organizational structure and responsibilities within the production team

To establish financial targets and cost reduction strategies for manufacturing processes

To document employee training programs and certification requirements for operators

2.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Which of the following are requirements for Special Characteristics according to the manual?

  1. All special characteristics (product and process) must be included in the control plan

  1. All DFMEA items must be designated as special characteristics

  1. Special characteristics must be indicated in the “Special Characteristic Classification” column of the control plan

  1. Customer-designated special characteristic classifications must be used as required

  1. DFMEA items with a severity rank of 9–10 that flow to PFMEA must be designated as special characteristics

3.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Which of the following are requirements for Pass-Through Characteristics (PTCs) according to the manual?

  1. Organizations must identify any characteristics that meet the definition of Pass-Through Characteristic

  1. Organizations must rely solely on supplier certification to control PTCs

  1. Organizations must have a process to validate the effectiveness of the supplier’s control

  1. Organizations must document all PTCs and review control methods with the customer

  1. If receiving inspection based on sampling is used, it must be included in the control plan

4.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Which of the following are requirements for Error-Proofing Confirmation according to the manual?

  1. Error-proofing devices must be listed on the control plan

  1. The method and frequency to confirm effectiveness must be included in the control plan

  1. Error-proofing verification frequency can be based on operator convenience

  1. Verification frequency must ensure containment since last good check

  1. Master defect samples must be clearly identified and controlled

5.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Which of the following are requirements for Families of Control Plans according to the manual?

  1. The organization must list all individual part numbers included in the Family Control Plan

  1. A separate document may be referenced if there are too many part numbers

  1. Family control plans can be applied regardless of equipment or process differences

  1. Family control plans may only be used when parts share the same or equivalent equipment and controls

  1. Part identification is optional in a Family Control Plan

6.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Which of the following are requirements for Rework and Repair Processes according to the manual?

  1. The control plan must indicate start and finish of rework using the original process

  1. A separate control plan is required for alternate rework processing

  1. Repairs may be performed without customer approval if internally authorized

  1. Any repair process must have its own control plan

  1. The organization must ensure traceability of reworked or repaired parts

7.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Which of the following are requirements for Reaction Plan Details according to the manual?

  1. The reaction plan can define general actions without detailed instructions

  1. The control plan must include specific actions or reference a document

  1. The reaction plan only applies to out of specification conditions

  1. The responsible role must be identified or referenced

  1. The reaction plan must address out of control and/or out of specification conditions

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?