Learning Akka (Video 27)

Learning Akka (Video 27)

Assessment

Interactive Video

Information Technology (IT), Architecture

University

Hard

Created by

Quizizz Content

FREE Resource

This video tutorial introduces multi-node testing, explaining its purpose and how it can be used to test applications in a real network setting. It covers the components of the multi-node testing kit, including the test conductor, multi-node spec, and SBT multi-JVM plugin. The tutorial guides viewers through setting up a project for multi-node testing, configuring the necessary files, and implementing test cases. It concludes with running the tests and reviewing the results, providing a comprehensive understanding of multi-node testing in a JVM environment.

Read more

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary goal of multi-node testing?

To run coordinated tests on multiple actor systems across different JVMs

To simplify the testing process by using fewer nodes

To test a single actor system on one JVM

To test the performance of a single node

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which component of the multi-node testing kit is responsible for coordinating nodes?

Actor System

SBT multi-JVM plugin

Multi-node Spec

Test Conductor

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the role of the SBT multi-JVM plugin in multi-node testing?

To simplify the actor system configuration

To manage network connections between nodes

To start tests in multiple JVMs, possibly on multiple machines

To compile code for a single JVM

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in preparing a project for multi-node testing?

Writing test cases

Adding the SBT multi-JVM plugin to the plugins.sbt file

Defining the actor system

Running the tests

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In multi-node testing, what is the purpose of defining a multi-node configuration?

To set up the network environment

To define nodes and their roles in the test

To specify the number of tests to run

To compile the test code

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What function is used to ensure all nodes have started before proceeding with a test?

runOn

enterBarrier

initiateTest

startNode

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How do you ensure that a worker instance is found on node one after being created on node two?

By using the runOn function

By using the test conductor

By using the enterBarrier function

By using the actor selection method