Stormwater Management Regulations and Requirements
Interactive Video
•
Other
•
11th - 12th Grade
•
Practice Problem
•
Hard
Patricia Brown
FREE Resource
Read more
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What are the two main types of activities that trigger the stormwater rule?
Minor land disturbing activities and minor improvements
Residential gardening and small-scale landscaping
Commercial building maintenance and repair
Major land disturbing activities and major substantial improvements
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the minimum land disturbance size that classifies an activity as a major land disturbing activity?
7500 square feet
1000 square feet
2500 square feet
5000 square feet
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is a requirement for major substantial improvement activities?
The project must be located in a residential area
The cost must exceed 50% of the pre-project value of the structure
The project must involve new construction only
The project must be completed within one year
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What are the two conditions for a project to be considered an AWDZ project?
Located in a residential area and funded by the federal government
Located in a commercial zone and funded by a private entity
Located within the highlighted area and funded by the district government
Located in a rural area and funded by a non-profit organization
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What does SWRV stand for in stormwater management?
Stormwater Reduction Variable
Stormwater Regulation Value
Stormwater Resource Verification
Stormwater Retention Volume
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of off-site retention volume (Off V)?
To increase the amount of stormwater on-site
To eliminate the need for on-site infrastructure
To meet SWRV requirements through off-site solutions
To reduce the cost of stormwater management
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How can projects comply with their SWRV requirements?
By using off-site retention volume or on-site solutions
By increasing the project size
By ignoring the SWRV requirements
By using only on-site green infrastructure
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?