Hoover Dam Quiz
Interactive Video
•
Geography
•
4th - 5th Grade
•
Practice Problem
•
Hard
Nancy Jackson
FREE Resource
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What are the two main purposes of the Hoover Dam mentioned in the introduction?
To provide water for irrigation and support wildlife
To act as a bridge and a recreational area
To control the Colorado River and generate electricity
To serve as a tourist attraction and a historical monument
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How much concrete was used in the construction of the Hoover Dam?
5.5 million tons
4 million tons
3.25 million tons
2 million tons
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Where is the Hoover Dam located?
In the state of Utah
In the state of Colorado
On the border between Nevada and Arizona
On the border between California and Nevada
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When did the construction of the Hoover Dam begin and end?
1931 to 1936
1930 to 1935
1929 to 1934
1932 to 1937
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What was the original proposed name for the Hoover Dam?
Colorado Dam
Boulder Dam
Grand Dam
Nevada Dam
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why was there controversy over naming the Hoover Dam?
Because it was named after a local landmark
Because it was named after a popular president
Because it was named after a president who lost re-election
Because it was named after a famous engineer
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is one of the main functions of the Hoover Dam?
To provide a habitat for fish
To serve as a tourist attraction
To generate electricity
To act as a historical monument
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?