

Creating Railings for Stairs
Interactive Video
•
Architecture
•
9th - 10th Grade
•
Practice Problem
•
Hard
Nancy Jackson
FREE Resource
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the first step in creating railings for stairs in the tutorial?
Select the circle command
Switch to the top UCS view
Press pull the circle
Copy the rod
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the diameter of the rod created in the tutorial?
50
25
100
75
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How are the rods positioned on the stairs?
By placing them randomly
By leaving one step in between
By leaving two steps in between
By placing them on every step
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of using the ortho mode while positioning rods?
To ensure rods are placed horizontally
To ensure rods are placed vertically
To ensure rods are placed at an angle
To ensure rods are placed straight
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the distance used to copy rods to the opposite side?
950
900
850
800
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which command is used to connect the rods with a top railing?
Extrude
Sweep
3D Polyline
Press Pull
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the radius of the circle used for the sweep command?
20
15
30
25
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?