1.
You perform an inspection on a building and document some critical and non-critical deficiencies on your inspection report. The owner wants to know how the difference between the deficiencies. You find the NFPA definitions of deficiencies in section_______.
a)
1.2.5
b)
2.1.3
c)
3.3.7
d)
4.1.9
2.
You are performing an inspection on a building. The owner wants to know if NFPA 25 allows other inspection, testing, or maintenance programs that provide an equal level of performance. You find information on application of the NFPA-25 standard in section_______.
a)
1.3
b)
2.1
c)
3.0
d)
4.1
3.
You are performing inspection, testing and maintenance per the NFPA 25 standard on an office complex. The property owner wants to know what he is responsible for. You find that information in section_____.
a)
3.1
b)
4.1
c)
5.1
d)
6.1
4.
During an inspection of a sprinkler system, you want to know at what level you need to inspect the sprinklers. This information is found in section______ of NFPA 25.
a)
4.1.7
b)
5.2.1
c)
7.4.3
d)
8.2.1
5.
During an inspection of a sprinkler system, you notice sprinklers that are heavily loaded with an oil film. You want to know if the sprinklers need to be replaced or not. This information is found in section_______of NFPA 25.
a)
3.1.1.2
b)
4.1.2
c)
5.2.1.1.2
d)
6.1
6.
As part of an inspection, you are testing the alarm devices on a sprinkler system by opening the test valve and observing when the alarm activates. You want to know the requirements in NFPA 25 on the water supplies during testing, if the fire pumps should remain on during testing or not. You find this information in section_______of NFPA 25.
a)
3.1
b)
3.1.2
c)
4.4
d)
5.1.1
7.
At a recent meeting with one of your customers, the owner of the building had a question on the requirements for recordkeeping of the inspection, testing, and maintenance records. This information is found in section_______ of NFPA 25.
a)
4.3
b)
5.2.1
c)
6.2
d)
7.1
8.
You find some concealed sprinklers missing escutcheons during an inspection. These must be replaced if found during an inspection per section________ of NFPA 25.
a)
2.2.1
b)
3.3.1
c)
4.8
d)
5.2.1.1.6
9.
You are performing an inspection on a sprinkler system. The requirements for where the pipe and fittings must be inspected from is found in section______ of NFPA 25.
a)
3.3.2
b)
4.1.1
c)
5.2.2
d)
5.3.1
10.
You find sprinklers during an inspection with a manufacture date of 1918. These must be replaced according to section_______ of NFPA 25.
a)
5.3.1.1.1.2
b)
5.5.5.5.4
c)
6.2.3.5.2.2.1
d)
7.2.2.4
11.
You want to find out the flow testing requirements for a standpipe per NFPA 25. This information is found in section______.
a)
6.2.2.2
b)
6.3.1
c)
6.3.3
d)
7.1.1.1
12.
You determine that a main drain flow test is required on a wet standpipe that is connected to a city water supply as its source of water supply. This requirement is found in section______ of NFPA 25.
a)
6.3.1.5
b)
7.1.1.1
c)
8.1
d)
9.2
13.
You are testing a private fire service main that has monitor nozzles. Section_____ of NFPA 25 requires that the monitor nozzles be operated and moved throughout their range annually to ensure operability.
a)
7.3.3.2
b)
7.5.1
c)
8.1.2.10
d)
9.1.1.1
14.
You want to know when it is required to flow test underground piping per NFPA 25 requirements. These requirements are found in section______.
a)
7.3.1
b)
8.1.1
c)
8.3
d)
9.1.2
15.
You want to find out the annual flow testing requirements for fire pumps in NFPA 25. This is found in section_______.
a)
8.3.3
b)
9.1.1
c)
10.2.4.5
d)
11.6.1
16.
To find the interior inspection requirements for water storage tanks, refer to section_____ of NFPA 25.
a)
7.7.1
b)
7.8.8
c)
8.6.1
d)
9.2.6
17.
To find out the inspection requirements for inspecting the piping and fittings of a water spray fixed system, refer to section________of NFPA 25.
a)
9.2.4.5
b)
10.1.1
c)
10.2.4.1
d)
11.2.1.4
18.
You have to perform testing on a water spray fixed system. You will find requirements on the operational tests in section______ of NFPA 25.
a)
10.1
b)
10.3
c)
11.4.7.8
d)
12.1
19.
Requirements for testing the foam concentrate discharge in a foam-water sprinkler system is found in section________ of NFPA 25.
a)
9.8.8.2
b)
10.3.6.1
c)
11.3.5
d)
12.1
20.
You are inspecting a water mist system, and discover that a few nozzles have some damage. Per NFPA 25, section________, these nozzles need to be replaced.
a)
9.8.5.7
b)
12.1.2.1.1
c)
12.7.7
d)
13.1
21.
You want to know the annual testing requirements for control valves. These requirements are found in section________ of NFPA 25.
a)
13.3.3.1
b)
13.4.3.2.1
c)
16.1.1.1
d)
16.2.1.1
22.
You have been assigned to inspect some check valves in a plant. You refer to section______to find out how often they need to be inspected, and the requirements.
a)
11.6.4.3
b)
12.1.1.1
c)
13.3.2.1
d)
13.4.2.1
23.
You have to inspect, test, and maintain deluge valves in an explosives plant. Section ________ of NFPA 25 requires each deluge valve to be trip tested annually at full flow in warm weather in accordance with manufacturer’s instructions.
a)
12.1.1.1.1
b)
13.3.3.2.2
c)
13.4.3.2.2
d)
13.4.3.4.1.2
24.
You are testing a dry pipe valve in a lumber yard. Section_____ of NFPA 25 requires that the dry pipe valve be trip tested annually during warm weather.
a)
13.4.4.2.2
b)
13.5.6
c)
14.1.1.1
d)
15.2
25.
You are inspecting a standpipe. Per section_______ of NFPA 25, hose valves shall be inspected for leaks.
a)
5.2.3.5
b)
6.1.1.1
c)
13.4.4.1
d)
13.5.6.1.6
26.
You have to flow test a backflow preventer. Per section______ of NFPA 25, an annual forward flow test is required at a minimum flow rate of system demand.
a)
11.7.6.5
b)
12.1.2.1.1
c)
13.6.2.1
d)
13.7.4
27.
You are in charge of inspecting, testing, and maintaining the sprinkler systems in a department store, which includes the fire department connections and piping. Per section_______of NFPA 25, the piping from the fire department connection to the check valve shall be hydrostatically tested at 150 PSI every five years.
a)
11.7.4
b)
12.1.1
c)
13.7.4
d)
13.8
28.
You discover plugged sprinklers during a routine inspection of a wet system. Per section_____of NFPA 25, an obstruction investigation must be conducted to determine the cause.
a)
14.3.1
b)
15.1.1.1
c)
16.2.3.4
d)
17.2
29.
You have to perform an internal examination of system piping, as part of an obstruction investigation. Per section________ of NFPA 25, you are required to inspect a minimum four points in the system: System valve, riser, cross main, and branch line.
a)
13.4.3.2.2
b)
13.5.6.1
c)
13.5.6.2.1.1
d)
14.3.2.2
30.
You are contracted to perform inspection, testing, and maintenance for the systems in a hospital. The building owner is required to assign an impairment coordinator per section_____ of NFPA 25 anytime the systems are impaired when shutting the systems down for testing, remodeling, or repairs.
a)
11.9.2.1
b)
13.8.1
c)
15.2.1
d)
16.1.1