wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

QUIZ 1

Total questions: 15

Worksheet time: 9mins

Name
Class
Date
1.

What is the course name?

a)

Sustainability Construction Management

b)

Sustainable Construction Engineering

c)

Sustainable Construction Management

d)

Sustainable Project Management

2.

What is the course code?

a)

BFC31703

b)

BFC32603

c)

BFC32703

d)

BFC32503

3.

Identify the Sustainable Construction Management course's lecturers for this semester?

a)

Dr. Muhammad Fikri Hasmori

b)

Dr. Sasitharan Nagapan

c)

Dr. Nor Haslinda Abas

d)

Dr. Fajaruddin Mustakim

4.

What is my name?

a)

SYED BURHANUDIN HELMI

b)

SYED BURHAINUDDIN HILMI

c)

SYED BURHANUDDIN HILMI

d)

SYED BURHANNDDIN HELMI

5.

__________is a temporary endeavor undertaken to create a unique product or service.

a)

Project

b)

Process

c)

Production

d)

Planning

6.

The following are the project characteristics except

a)

Repetitive

b)

Unique

c)

Limited Time

d)

Limited Resources

7.

Which are the triple constraint?

a)

Cost, Resources, Schedule

b)

Cost, Schedule, Product

c)

Cost, Schedule, Quality

d)

Cost, Resource, Schedule

8.

Choose the correct sequence of phases in project management.

a)

Project initiation, feasibility study, procurement, design, construction, hand over.

b)

Feasibility study, project initiation, design, procurement, construction, hand over.

c)

Project initiation, feasibility study, design, procurement, construction, hand over.

d)

Feasibility study, project initiation, procurement, design, construction, hand over.

9.

Identify the basic management activity

a)

Implementing

b)

Financing

c)

Controlling

d)

Planning

10.

__________may lead to success and sustainability in construction management.

a)

International investment

b)

Gain Mega project

c)

Effective organization

d)

ICT

11.

Choose the pillars that govern the sustainable construction concept?

a)

Social Well-Being

b)

Safety and Health

c)

Economic Prosperity

d)

Environmental Protection

12.

Possible Strategies for Sustainable Construction.

a)

Identify the reusable materials.

b)

Identify the methods to reduce waste.

c)

Identify the environmental friendly building materials.

d)

Identify the methods to reduce the environment impact.

13.

Identify the common type of organizational structures in construction sector.

a)

Dual

b)

Functional

c)

Matrix

d)

Project

14.

How we can prevent excessive construction waste?

a)

Design for durability

b)

Design for disassembly

c)

Use IBS

d)

Design for adaptability

15.

Select TWO (2) the most popular methods of project delivery in Malaysia.

a)

Construction Management

b)

Owner-Builder Agreement

c)

Design and Build

d)

Traditional