wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

ENGG1100 Project C Client Briefing

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

How long is Oxley Creek ?

a)

200 km

b)

30 km

c)

5 km

d)

Don't know

2.

What are the land uses in the catchment ?

a)

Parkland, residential and industrial

b)

Retail, agricultural and industrial

c)

National park, residential and recreation

d)

All of the above

3.

Who are the key stakeholders ?

a)

Government authorities

b)

Community groups

c)

Oxley Creek Transformation Pty Ltd

d)

All of the above

4.

What is a Draft Master Plan ?

a)

A document detailing design options.

b)

A community consultation plan.

c)

A document outlining key project goals and objectives.

d)

An extension of a cunning plan.

5.

What does 'shared use' transport mean for this project?

a)

Pedestrians, bicycles and cars use the transport network.

b)

Pedestrian, animals and watercraft benefit from a bridge crossing.

c)

Women and men use the transport network.

d)

Pedestrians and bikes use the transport network

6.

What are some of the proposals in the Draft Master Plan?

a)

Cattle grazing

b)

Viewing towers

c)

Mini golf

d)

All of the above

7.

How wide should the proposed creek crossing span?

a)

10 metres

b)

15 metres

c)

20 metres

d)

25 metres

8.

What aspects are important when considering designing a creek crossing?

a)

Who is paying for the crossing.

b)

Use of similar designs in the area.

c)

Deciding the quickest design.

d)

None of the above.

9.

What material choices are appropriate for this creek crossing?

a)

Steel

b)

Laminated timber

c)

Recycle plastic

d)

All of the above

10.

Why does Oxley Creek need a crossing?

a)

Because otherwise we wouldn't have a ENGG1100 project.

b)

So the chicken can get to the other side.

c)

To allow civil engineers to show off.

d)

It aligns with projects goals and objectives.