1.

What government entity is responsible in regulating the practice of architecture?

a)

DOJ

b)

UAP-IAPOA

c)

DTI/SEC

d)

PRC-PRBoA

2.

The Consulting Architect in this area of practice places value on the building/ structure condition and defects, and on its repair and maintenance, including the required improvements. Appraisal is universally defined as an act or process of estimating value.

a)

Building Components

b)

Building Appraisal

c)

Security Evaluation and Planning

d)

Forensic Architecture

3.

Can an Architect be the Architect-of-Record and Architect-in-Charge of construction at the same time?

a)

Yes, it is possible.

b)

No, it is against the Civil Code.

c)

No, they should always be different.

d)

It depends on the type of project.

4.

What Architectural Service/Phase is the part where the Architect and Client choose the Contractor?

a)

Construction Phase

b)

Evaluation Phase

c)

Bidding/Negotiation Phase

d)

Contract Document Phase

5.

A type of pre-design service where the Architect states the project terms of reference (ToR) including the concept, objectives and other necessary requirements to bid out architectural services (whether public or private).

a)

Design Brief Preparation

b)

Architectural Programming

c)

Space Planning

d)

Feasibility Study

6.

An architect refuses to give the original plan to the Owner. Why?

a)

The Owner is entitled only to the blueprint

b)

In order to prevent the Owner from making duplicates and/or constructing without his knowledge

c)

The architects work is covered by intellectual property rights/law

d)

All of the Above

7.

What is SPP No. 204-B?

a)

SPP on Full time Supervision Services

b)

SPP on Specialized Architectural Services

c)

SPP on Post-Construction Services

d)

SPP on Construction Management Services

8.

What is SPP No. 204-A?

a)

SPP on Full time Supervision Services

b)

SPP on Specialized Architectural Services

c)

SPP on Post-Construction Services

d)

SPP on Construction Management Services

9.

What is SPP No. 205?

a)

SPP on Full time Supervision Services

b)

SPP on Specialized Architectural Services

c)

SPP on Post-Construction Services

d)

SPP on Construction Management Services

10.

What is SPP No. 208?

a)

SPP on Design-Build Services

b)

SPP on Pre-Design Services

c)

SPP on Comprehensive Architectural Services

d)

SPP on Architectural Design Competition

11.

_________________ simplifies and expedites the process of project delivery while providing creative cost-effective solutions.

a)

SPP on Design-Build Services

b)

SPP on Pre-Design Services

c)

SPP on Comprehensive Architectural Services

d)

SPP on Architectural Design Competition

12.

The ________________ nominally include consultation, prefeasibility studies, feasibility studies, site selection and analysis, site utilization and land-use studies, architectural research, architectural programming, space planning, space management studies, value management, design brief preparation, promotional services and other related activities.

a)

SPP on Design-Build Services

b)

SPP on Architectural Design Competition

c)

SPP on Comprehensive Architectural Services

d)

SPP on Pre-Design Services

13.

__________________________ refers to the range of professional services that covers Pre-design Services, Regular Design Services, Specialized Architectural Services, Construction Services and Post-Construction Services.

a)

SPP on Design-Build Services

b)

SPP on Architectural Design Competition

c)

SPP on Comprehensive Architectural Services

d)

SPP on Pre-Design Services

14.

Printed description of work.

a)

General Conditions

b)

Drawings

c)

Bid Bulletin

d)

Specifications

15.

A type of Pre-Design Service where the Architect determines the adequate size and appropriate configuration and assemblage for a proposed project in consideration of the use, allocation and interface of spaces for given activities. This is done mainly through primary data gathering such as interviews, consultations, interfaces, focus group discussions (FGDs), space planning surveys, space audits, etc. and subsequent analyses i.e. spatial layouts with stacking concepts, specially for multi-storey structures.

a)

Architectural Programming

b)

Space Planning

c)

Space Management Studies

d)

Design Brief Preparation

16.

NOT included in the Project Construction Cost.

a)

NOT included in the Project Construction Cost.

b)

Architectural interiors designed by the Architect

c)

Site development plan elements designed by the Architect

d)

Alarm and Clock System indicated in the plans prepared by the Architect

17.

Under the Multiple of Direct Personnel Expense, the multiplier ranges from ____ depending on the office set-up, overhead and experience of the Architect and the complexity of the Project.

a)

1.0 – 2.5

b)

1.5 – 2.0

c)

1.5 – 3.5

d)

1.5 – 2.5

18.

If there are two architects on a certain project, the Architect-of-Record and the Architect-in-Charge of construction, the building collapses, who is more liable?

a)

Architect-of-Record

b)

Architect-in-charge of Construction

c)

It depends on the investigation

d)

Both will be liable

19.

What offense is committed when an architect is found using the seal of another architect?

a)

Illegal practice

b)

Misdemeanor

c)

Nothing

d)

Misrepresentation

20.

In what type of services do making of brochures/leaflets/fliers/posters and promotional & advertisement campaign are included?

a)

Regular Design Services

b)

Comprehensive Architectural Services

c)

Pre-Design Services

d)

Specialized Allied Services

21.

If portions of the building/s are erected at different periods of time, thus increasing the construction period and Architect's burden of services, charges pertaining to services rendered during the Construction Phase shall be doubled. A suspension of construction for a period not exceeding ___ months shall not be covered by this provision.

a)

7

b)

5

c)

6

d)

4

22.

Which of the following is not covered by the Owner-Architect Agreement?

a)

Periodic Construction Supervision

b)

Full Regular or Basic Detailed Engineering Design Services

c)

Full Regular or Basic Detailed Architectural Design Services

d)

Fulltime Construction Supervision

23.

What offense is committed if a person uses the name of another architect in his practice without the consent of the latter?

a)

Nothing

b)

Misdemeanor

c)

Misrepresentation

d)

Illegal practice

24.

What do you call Working Drawings, Specifications, Estimates and General Conditions?

a)

Construction Drawings

b)

Project Manual

c)

Project Requirements

d)

Contract Documents

25.

This cost-based method of compensation is applicable only to non-creative work such as accounting, secretarial, research, data gathering, preparation of reports and the like.

a)

Multiple of Direct Personnel Expense

b)

Fixed Fee/Lump Sum Method

c)

Percentage Method

d)

Professional Fee + Expenses

26.

For specialized allied services, what is the activity of total planning that encompasses social, physical and environmental factors?

a)

Environmental Planning

b)

Physical Planning

c)

Comprehensive Planning

d)

Comprehensive Architectural Services

27.

Who gives the directive to start the project?

a)

Project Manager

b)

Owner

c)

Construction Manager

d)

Contractor

28.

Under comparative selection, the first step in the selection process involves Invitation. The Client issues an invitation which includes the Terms of Reference (ToR) for the project which is based on the ________ prepared by another Architect.

a)

Schematic design

b)

Architectural program

c)

Conceptual framework

d)

Design Brief

29.

What type of service involves the detailed planning and design of light transmission, timing and control for compatibility with the architectural design concept?

a)

Architectural Lighting Layout and Design Services

b)

Architectural Lighting Services

c)

Architectural Lighting Transmission Design Services

d)

Architectural Lighting, Planning and Design Services

30.

Where does physical planning services fall?

a)

Pre-Design Services

b)

Specialized Allied Services

c)

Design and Planning Services

d)

Regular Design Services