What government entity is responsible in regulating the practice of architecture?
DOJ
UAP-IAPOA
DTI/SEC
PRC-PRBoA
The Consulting Architect in this area of practice places value on the building/ structure condition and defects, and on its repair and maintenance, including the required improvements. Appraisal is universally defined as an act or process of estimating value.
Building Components
Building Appraisal
Security Evaluation and Planning
Forensic Architecture
Can an Architect be the Architect-of-Record and Architect-in-Charge of construction at the same time?
Yes, it is possible.
No, it is against the Civil Code.
No, they should always be different.
It depends on the type of project.
What Architectural Service/Phase is the part where the Architect and Client choose the Contractor?
Construction Phase
Evaluation Phase
Bidding/Negotiation Phase
Contract Document Phase
A type of pre-design service where the Architect states the project terms of reference (ToR) including the concept, objectives and other necessary requirements to bid out architectural services (whether public or private).
Design Brief Preparation
Architectural Programming
Space Planning
Feasibility Study
An architect refuses to give the original plan to the Owner. Why?
The Owner is entitled only to the blueprint
In order to prevent the Owner from making duplicates and/or constructing without his knowledge
The architects work is covered by intellectual property rights/law
All of the Above
What is SPP No. 204-B?
SPP on Full time Supervision Services
SPP on Specialized Architectural Services
SPP on Post-Construction Services
SPP on Construction Management Services
What is SPP No. 204-A?
SPP on Full time Supervision Services
SPP on Specialized Architectural Services
SPP on Post-Construction Services
SPP on Construction Management Services
What is SPP No. 205?
SPP on Full time Supervision Services
SPP on Specialized Architectural Services
SPP on Post-Construction Services
SPP on Construction Management Services
What is SPP No. 208?
SPP on Design-Build Services
SPP on Pre-Design Services
SPP on Comprehensive Architectural Services
SPP on Architectural Design Competition
_________________ simplifies and expedites the process of project delivery while providing creative cost-effective solutions.
SPP on Design-Build Services
SPP on Pre-Design Services
SPP on Comprehensive Architectural Services
SPP on Architectural Design Competition
The ________________ nominally include consultation, prefeasibility studies, feasibility studies, site selection and analysis, site utilization and land-use studies, architectural research, architectural programming, space planning, space management studies, value management, design brief preparation, promotional services and other related activities.
SPP on Design-Build Services
SPP on Architectural Design Competition
SPP on Comprehensive Architectural Services
SPP on Pre-Design Services
__________________________ refers to the range of professional services that covers Pre-design Services, Regular Design Services, Specialized Architectural Services, Construction Services and Post-Construction Services.
SPP on Design-Build Services
SPP on Architectural Design Competition
SPP on Comprehensive Architectural Services
SPP on Pre-Design Services
Printed description of work.
General Conditions
Drawings
Bid Bulletin
Specifications
A type of Pre-Design Service where the Architect determines the adequate size and appropriate configuration and assemblage for a proposed project in consideration of the use, allocation and interface of spaces for given activities. This is done mainly through primary data gathering such as interviews, consultations, interfaces, focus group discussions (FGDs), space planning surveys, space audits, etc. and subsequent analyses i.e. spatial layouts with stacking concepts, specially for multi-storey structures.
Architectural Programming
Space Planning
Space Management Studies
Design Brief Preparation
NOT included in the Project Construction Cost.
NOT included in the Project Construction Cost.
Architectural interiors designed by the Architect
Site development plan elements designed by the Architect
Alarm and Clock System indicated in the plans prepared by the Architect
Under the Multiple of Direct Personnel Expense, the multiplier ranges from ____ depending on the office set-up, overhead and experience of the Architect and the complexity of the Project.
1.0 – 2.5
1.5 – 2.0
1.5 – 3.5
1.5 – 2.5
If there are two architects on a certain project, the Architect-of-Record and the Architect-in-Charge of construction, the building collapses, who is more liable?
Architect-of-Record
Architect-in-charge of Construction
It depends on the investigation
Both will be liable
What offense is committed when an architect is found using the seal of another architect?
Illegal practice
Misdemeanor
Nothing
Misrepresentation
In what type of services do making of brochures/leaflets/fliers/posters and promotional & advertisement campaign are included?
Regular Design Services
Comprehensive Architectural Services
Pre-Design Services
Specialized Allied Services
If portions of the building/s are erected at different periods of time, thus increasing the construction period and Architect's burden of services, charges pertaining to services rendered during the Construction Phase shall be doubled. A suspension of construction for a period not exceeding ___ months shall not be covered by this provision.
7
5
6
4
Which of the following is not covered by the Owner-Architect Agreement?
Periodic Construction Supervision
Full Regular or Basic Detailed Engineering Design Services
Full Regular or Basic Detailed Architectural Design Services
Fulltime Construction Supervision
What offense is committed if a person uses the name of another architect in his practice without the consent of the latter?
Nothing
Misdemeanor
Misrepresentation
Illegal practice
What do you call Working Drawings, Specifications, Estimates and General Conditions?
Construction Drawings
Project Manual
Project Requirements
Contract Documents
This cost-based method of compensation is applicable only to non-creative work such as accounting, secretarial, research, data gathering, preparation of reports and the like.
Multiple of Direct Personnel Expense
Fixed Fee/Lump Sum Method
Percentage Method
Professional Fee + Expenses
For specialized allied services, what is the activity of total planning that encompasses social, physical and environmental factors?
Environmental Planning
Physical Planning
Comprehensive Planning
Comprehensive Architectural Services
Who gives the directive to start the project?
Project Manager
Owner
Construction Manager
Contractor
Under comparative selection, the first step in the selection process involves Invitation. The Client issues an invitation which includes the Terms of Reference (ToR) for the project which is based on the ________ prepared by another Architect.
Schematic design
Architectural program
Conceptual framework
Design Brief
What type of service involves the detailed planning and design of light transmission, timing and control for compatibility with the architectural design concept?
Architectural Lighting Layout and Design Services
Architectural Lighting Services
Architectural Lighting Transmission Design Services
Architectural Lighting, Planning and Design Services
Where does physical planning services fall?
Pre-Design Services
Specialized Allied Services
Design and Planning Services
Regular Design Services