wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Intro to Construction Drawings Core 1st & 4th

Total questions: 35

Worksheet time: 17mins

Name
Class
Date
1.

A professional, licensed person who creates and designs drawings for a construction project.

a)

engineer

b)

Architect

c)

professional constructionist

d)

civil planner

2.

A part of a drawing sheet that includes some general information about the project.

a)

hidden lines

b)

leader

c)

legend

d)

title block

3.

A dashed line showing an object obstructed from view by another object is:

a)

legend

b)

hidden lines

c)

beam

d)

blueprints

4.

A large, horizontal structural member made of concrete, steel, stone, wood, or other structural material to provide support above a large opening is:

a)

beam

b)

civil plan

c)

blueprints

d)

contour lines

5.

A description of the symbols and abbreviations used in a set of drawings is:

a)

hidden lines

b)

legend

c)

not to scale

d)

schematic

6.

The traditional name used to describe construction drawings is:

a)

beam

b)

contour lines

c)

blueprints

d)

sketching architecture

7.

A drawing of the view of the roof from above the building is:

a)

beam

b)

isometric drawing

c)

not to scale

d)

roof plan

8.

Drawings that show the location of the building on the site from an aerial view, including contours, trees, construction features, and dimensions is:

a)

plumbing bobs

b)

civil war documents

c)

civil plans

d)

Jack Beam

9.

The ratio between the size of a drawing of an object and the size of the actual object is:

a)

fish coverings

b)

scales

c)

sails

d)

1:1 ratio

10.

The making of a set of construction drawings with the aid of a computer is:

a)

Cad-berry

b)

Computer Aided drafting (CAD)

c)

Cadmium Layered Drawings (CLD)

d)

schematic

11.

A set of engineered drawings used to support the architectural design is:

a)

enginetectural design

b)

Choo-Choo rendering

c)

Computer aided drafting (CAD)

d)

structural plan

12.

Architectural or working drawings used to represent a structure or system is:

a)

electrical plans

b)

construction drawings

c)

scientific principles

d)

workitectural drawings

13.

A drawing that represents a material or component on a plan is:

a)

Cymba

b)

Rad

c)

symbol

d)

doo dad

14.

Enlarged views of part of a drawing used to shown an area more clearly is:

a)

The tale drawing

b)

the sail drawing

c)

detail drawing

d)

symbol equivalent

15.

Engineered drawings that show the mechanical systems, such as motors and piping is:

a)

napa plans

b)

Mr Goodwrench plans

c)

NASF certified plans

d)

mechanic plans

16.

Engineered drawings that show all electrical supply and distribution is:

a)

Engee-Electrical Plans

b)

Plans for the evening

c)

Electrical Plans

d)

Supplied electricity plans

17.

A drawing that provides an aerial view of the layout of each room

a)

floor lines

b)

store plan

c)

floor plan

d)

lined floors plans

18.

A drawing that shows the layout and elevation of the building foundation is:

a)

foundation plan

b)

plumber

c)

Side view

d)

hidden lines

19.

Side view of a building or object, showing height and width is:

a)

elevation

b)

drawing elevations

c)

elevation drawings

d)

side to side elevations

20.

A person who applies scientific principles in design and construction is:

a)

scientific carpenter dude

b)

guy who wears bib overalls and a lab coat

c)

engineer

d)

construction professional

21.

The identification of lines and other symbols on a construction drawing is called the ____

a)

legend

b)

symbol data

c)

scale

d)

title bar

22.

Site plans are developed using a(n) _____.

a)

engineer's scale

b)

1/4" = 1'-0" scale

c)

NTS scale

d)

architect's scale

23.

A dimension is a measurement written as a _____.

a)

number

b)

symbol

c)

range

d)

letter

24.

Gridlines are used to _____.

a)

indicate a cross-section of material

b)

indicate that an object has been broken off

c)

make it easy to refer to specific locations on the plan

d)

indicate land boundaries on the site plan

25.

On the drawing, a project is identified by the _____ found in the title block

a)

company Legos

b)

legend

c)

kit-kat

d)

sheet title

26.

To avoid confusion, the letters I, O, and Q and the numbers 1 and 0 are omitted from the _____.

a)

NTSB drawings

b)

title block

c)

ford contour lines

d)

gridline system

27.

To clarify information that cannot be shown on the drawings, the architectural and engineering firm will prepare _____.

a)

specifications

b)

contracts

c)

floor plans

d)

change order

28.

The architect's scale is used for drawing _____.

a)

contracts

b)

specifications order

c)

drawing area

d)

floor plans

29.

Information about the structure or assembly is provided in the _____.

a)

legend borders

b)

title block

c)

plot area

d)

proposal block

30.

A keynote is a number or letter that is used with a leader and arrowhead to identify a specific object; it usually appears in _____.

a)

a square or circle

b)

mechanical

c)

RFI

d)

seven digits

31.

In the alphabet of lines, an area not included in the cutting line view is shown with _____.

a)

c sections

b)

criss-cross lines

c)

section cuts

d)

alphabet lines

32.

To clarify any discrepancies in the plans, the foreman should use a(n) _____.

a)

RFI

b)

refri

c)

deep fri

d)

pan fri

33.

The material to be used for the walls would be found on the _____ plan.

a)

waller's plan

b)

sheetrocker plan

c)

wall paneller plan

d)

structural

34.

Plans used for work that has to do with construction in or on the earth are called _____ plans.

a)

on earth

b)

civil

c)

civil liberties

d)

an object is hidden

35.

Break lines are used to show that _____.

a)

there are tasty waves expected

b)

only part of an object is represented to save space

c)

an object will appear in a separate drawing

d)

hiding the cutting line view is not being used