Lean Green Belt dag 1

Total questions: 15

Worksheet time: 8mins

Name
Class
Date
1.

What is Lean?

a)

Philosophy to make better products

b)

Business strategy based on customer requirements

c)

Headcount reduction to reduce cost

d)

Fitness programm

2.

Muda is the Japanese term used to describe

a)

The waste generated into a system

b)

The overburden of machines or operators

c)

The uneveness in an operation

d)

Any time there is overproduction

3.

An important characteristic of a process is lead time. Lead time is:

a)

The time it takes for one unit to undergo all process steps through the process

b)

The time value is added to the material the flows through the process

c)

The elapsed time between the moment a product is entering the first process step and the moment it is leaving the last process step

d)

The cumulative time the product is waiting within the process

4.

What type of waste is packing at step one and unpacking and repacking at step two?

a)

Over production

b)

Over processing

c)

Motion

d)

Transportation

5.

The Voice of the Customer refers to identifying customers' needs through which of the following mechanisms?

a)

Complaints

b)

Defects

c)

Survey

d)

Information requests

6.

Checks in a pharmaceutical plant due to compliance, are

a)

Value Added

b)

Non Value Added

c)

Necessary Non Value Added

d)

None of these

7.

Which type of flow is the ultimate goal?

a)

Batch

b)

Pull

c)

One-piece-flow

d)

FIFO

8.

Quality at the source means that

a)

from the first process step, every step is aimed at not passing on mistakes

b)

raw material shoud be of highest quality

c)

the main goal of the quality department is to work defect free

d)

employees are aware that making mistakes should be avoided

9.

Takt time is 2 minutes; if the cycle time is 3 minutes, which of the following is true?

a)

FIFO lanes are in place

b)

Flow is adequate

c)

The company can meet customer demand

d)

The company cannot meet customer demand

10.

What is the worst type of muda?

a)

overproduction

b)

transport

c)

defects

d)

waiting

11.

Which are the Five Lean principles?

a)

Takt time, flow, pull, interval and pitch

b)

Takt time, flow, pull, Kanban and perfection

c)

Heijunka, standard work, TQM, Just-in-time and kaizen

d)

Value, value stream, flow, pull and perfection

12.

The best way to describe Lean is

a)

An ideology and a set of instruments aimed at achieving the lowest cost per unit produced

b)

An ideology and a set of instruments aimed at achieving an "ideal" way of working

c)

A quality standard that allows only 3.4 defects per million opportunities

d)

A set of techniques to prevent and reduce errors

13.

Inspection is a waste

a)

Yes, ever

b)

No, never

c)

No, if company/organisation wants to increase its quality

d)

No, if the customer is willing to pay for it

14.

Waste that involves unavoidable activities is referred as

a)

Mura

b)

Non Added Value

c)

Necessary Non Added Value

d)

Added Value

15.

A baking process takes 4 Hrs. Average 120 pieces in the oven. The maximum capacity is 240 pieces. What is the Cycle time?

a)

1 Minute

b)

2 Minutes

c)

4 Minutes

d)

It depends on the situation