Lean Green Belt dag 4

Total questions: 15

Worksheet time: 8mins

Name
Class
Date
1.

Which process should be scheduled?

a)

Gateway process

b)

Final assembly process

c)

Pacemaker process

d)

Shipping process

2.

Which Lean concept could be applied to link processes that share a common Cycle time and do not have setup steps?

a)

One-piece flow

b)

Interval

c)

Schedule one point

d)

Supermarket

3.

Which of the following is NOT a technique for achieving market demand stability?

a)

Develop partnerships with major suppliers

b)

Have customers take delivery of product less frequently

c)

Provide buffer of finished goods

d)

Provide buffer of backlog

4.

Which type of setup can be done with the machine running?

a)

External

b)

Internal

c)

Process

d)

Traditional

5.

What is the type of Kanban system in which an empty container serves as the signal for the upstream process to fill the bin?

a)

Production Kanban

b)

Withdrawal Kanban

c)

Supermarket

d)

Two-bin Kanban

6.

What is a conveyance Kanban?

a)

authorizes to move something from place A to place B

b)

authorizes to start the production of something

c)

authorizes to order something

d)

authorizes to stop the production immediately

7.

If you add more Kanbans, you will

a)

have more WIP

b)

reduce the throughput time of the products

c)

limit the amount of inventory in the process

d)

be violating the JIT principles.

8.

What is the difference between push and pull?

a)

Push is controlled by central planning, pull not

b)

Push always uses MRP as planning method

c)

Pull limits WIP, push not

d)

Pull system only reacts to real demand

9.

Heijunka in VSM stands for

a)

Process to limit amount of WIP in flow

b)

Method to match workload to a fixed interval

c)

Visual management technique to show Kanban cards that need to be conveyed

d)

Device for suppliers to classify work orders to work load

10.

In which case should you connect two processes through a FIFO type link?

a)

When Sequential Pull is used

b)

When Supermarket Pull is used

c)

When Production Kanbans are used

d)

When Conveyance Kanbans are used

11.

What is not an element of Improve in DMAIC?

a)

Poka Yoke

b)

Standard work

c)

Kaizen blitz

d)

Hypothesis testing

12.

In project management, WBS defines

a)

a critical chain

b)

a critical path

c)

a task breakdown structure

d)

a PERT path

13.

Poka-Yoke is a strategy for which of the following?

a)

Making machines run better

b)

Cleaning the working space

c)

Mistake proofing processes

d)

Six Sigma

14.

An example of a visual workplace is

a)

a workplace with walls of glass

b)

a workplace where every member of a Lean project can collaborate

c)

a design of a future state workplace

d)

a workplace where pictures, graphics, and other images are visible to quickly and simply convey meaning and understand information

15.

A good graph for a reporting board should be

a)

as detailed as possible

b)

readable at 2 meters distance

c)

provided with a trend line

d)

colorfull