PreTest - Scrum Quiz

Total questions: 10

Worksheet time: 4mins

Name
Class
Date
1.

Scrum Framework is founded on

a)

Empiricism

b)

Empiricism and Technical Practices

c)

Empiricism and Emotional Intelligence

d)

All

2.

The three pillars of empirical process control are?

a)

Inspection, Retrospective, Demonstration

b)

Inspection, Transparency, Adaptation

c)

Planning, Inspection, Adaptation

d)

Planning, Demonstration, Retrospective

3.

The time-box for a Daily Scrum is?

a)

The same time of day every day

b)

15 min for a 4 week sprint-Shorter Sprints its usually shorter

c)

4 hour

d)

15 minutes

4.

What is the recommended size for a Development Team (within the Scrum Team)?

a)

Minimal 7

b)

7 plus or minus 2

c)

3 to 9

d)

9

5.

Which statement best describes a Product Owner's responsibility?

a)

Optimizing the value of the work the Development Team doe

b)

Directing the Development Team

c)

Managing the project

d)

Keeping stakeholders at bay

6.

Why is the Daily Scrum held at the same time and same place?

a)

The place can be named

b)

The consistency reduces complexity

c)

The Product Owner demands it

d)

Rooms are hard to book and this lets it be booked in advance

7.

Who is required to attend the Daily Scrum?

a)

The Development Team

b)

The Scrum team

c)

The Development Team and Scrum Master

d)

The Development Team and Product Owner

8.

Who has the final say on the order of the Product Backlog?

a)

The Stakeholders

b)

The Scrum Master

c)

The Development Team

d)

The Product Owner

9.

How a Product Backlog should be ordered?

a)

Based on the size of the items

b)

Based on the risk of the items

c)

Based on the float of the items

d)

Based on the value of the items

10.

Who has the authority to cancel a Sprint?

a)

Product Owner

b)

Scrum Master

c)

Development Team

d)

All roles togethe