1.

When visiting a client site, the primary work site regulations governing the use of PPE are typically defined by which of the following?

a)

the client

b)

the AHJ

c)

the client's insurance company

d)

your company

2.

Which of the following is not considered part of the safety equipment that AV technicians should use when working at a work site?

a)

PPE, such as hard hats, work boots, gloves and safety glasses

b)

tools with nonslip handles

c)

approved non conductive ladders

d)

fall protection

3.

What is a site survey checklist typically used to do?

a)

document the required AV system components for a client

b)

document the AV, electrical, and mechanically systems

c)

document information about client satisfaction with the AV system

d)

document general information about a client and the site that may be relevant for the AV design and installation tasks

4.

What type of plan drawing depicts the layout of items on the ceiling?

a)

reflected ceiling plan

b)

detail ceiling drawing

c)

reflected floor plan

d)

elevation drawing

5.

What type of drawing depicts the ductwork that goes through the building?

a)

mechanical drawing

b)

reflected ceiling plan

c)

detail drawing

d)

section drawing

6.

What type of drawing would you use to determine the characteristics of a wall to ascertain the appropriate height and location of a video display?

a)

elevation drawing

b)

reflected ceiling plan

c)

detail drawing

d)

mechanical drawing

7.

What type of drawing would you use to determine what is behind a wall or above ceiling that could interfere with your system installation plan?

a)

elevation drawing

b)

reflected ceiling plan

c)

section drawing

d)

mechanical drawing

8.

What drawing would you review to find out exactly how the projector should be mounted to the ceiling?

a)

reflected ceiling plan

b)

detail drawing

c)

AV system schematic

d)

mechanical drawing

9.

Which abbreviation on a drawing tells you something on the drawing is not consistent with the scale?

a)

NTS

b)

NCS

c)

SCN

d)

NIC

10.

Which abbreviation, along with a measurement given on a drawing, tells you how high on a wall an interface plate should be installed?

a)

AFF

b)

FUT

c)

SCN

d)

NIC

11.

Which type of drawing provides the best information about the ducts and piping in a facility?

a)

mechanical drawing

b)

section drawing

c)

electrical drawing

d)

structural drawing

12.

On a drawing with a 1:50 scale, 2 centimeters equal how many meters?

a)

1

b)

2

c)

1/2

d)

none of the above

13.

On a drawing using a 1/4 scale, 6 inches equals how many feet?

a)

24

b)

8

c)

16

d)

none of the above

14.

What does a section cut symbol on a drawing indicate?

a)

an interior view of a wall or ceiling structure

b)

the number of a more detailed drawing that depicts a specific portion of a master drawing

c)

a drawing that depicts items in great detail, such as equipment mounting plans

d)

a view of a wall from an angle

15.

Which of the following equations allows you to convert a measurement of 10 inches into an equivalent measurement in millimeters?

a)

25.4 x 10 = 254mm

b)

3.94 x 10 = 39.4mm

c)

25.4 / 10 = 2.54mm

d)

3.94 / 10 = .394mm

16.

Which of the following equations allows you to convert a measurement of 100 millimeters into an equivalent measurement in inches?

a)

100 x 25.4 = 2540 in

b)

100 x 2.54 = 254 in

c)

100 / 25.4 = 3.94 in

d)

100 / 2.54 = .394 in

17.

What is the square footage of a space measuring 15 feet wide by 20 feet long by 10 feet high?

a)

30 square feet

b)

35 square feet

c)

300 square feet

d)

3000 square feet

18.

What is the cubic footage of a space measuring 15 meters wide by 20 meters long by 3 meters high?

a)

39 cubic meters

b)

95 cubic meters

c)

900 cubic meters

d)

9000 cubic meters