1.

An uncertain event or set of circumstances that would (if it occurred) have an effect on the achievement of one or more objectives’ best describes what….?

a)

Risk event

b)

Risk appetite

c)

An issue

d)

Risk attitude

2.

Which of the following is a response category to a threat?

a)

Accept

b)

Reduce

c)

Avoid

d)

All of these

3.

The original 'untreated' risk that is identified is referred to as……

a)

Secondary risk

b)

Inherent risk

c)

Residual risk

d)

An issue

4.

Which role is responsible for executing the approved response to a risk?

a)

Project Manager

b)

Risk Owner

c)

Risk Manager

d)

Risk Actionee

5.

A risk description should always include which three elements

a)

Probability / Impact / Proximity

b)

Cause / Event / Effect

c)

Avoid / Reduce / Accept

d)

Enhance / Exploit / Share

6.

Which of the following is NOT a technique used for Risk Identification?

a)

Checklist

b)

PESTLE

c)

Probability v Impact matrix

d)

Brainstorming

7.

Which of the following is a response category to a opportunity?

a)

Avoid

b)

Enhance

c)

Reduce

d)

Transfer

8.

Which role is responsible for ensuring the appropriate level of Risk Management is applied to a project?

a)

Project Manager

b)

Risk Owner

c)

Risk Manager

d)

Risk Actionee

9.

Which of the following words should NOT be used when identifying an issue?

a)

May not happen

b)

Is happening

c)

Has happened

d)

Will happen

10.

Risks can be assessed using what types of methods?

a)

Qualitative methods only

b)

Quantitative methods only

c)

Both Qualitative and Quantitative methods

d)

Neither Qualitative or Quantitative methods

11.

Risks can be assessed against which of the following criterion?

a)

Probability

b)

Proximity

c)

Impact

d)

All three

12.

In which step of the process would a Risk Management Plan be produced?

a)

Establish How

b)

Identify

c)

Prioritise and Measure

d)

Monitor and Control

e)

Act / Monitor

13.

Complete the following sentence 'The response of an individual or group to a given uncertain situation’ is the definition of 'risk……..'

a)

Appetite

b)

Attitude

c)

Tolerance

d)

Event

14.

In which step of the process would a Planned response be executed?

a)

Establish How

b)

Identify

c)

Prioritise and Measure

d)

Monitor and Control

e)

Act / Monitor

15.

Which of the following categories could be used to describe the impact of a risk event?

a)

Time

b)

Cost

c)

Quality

d)

All of these