1.

After creating the task will you be able to upload photos or videos against the particular task line?

a)

Not possible to upload.

b)

Yes it is possible to upload

c)

There is no features as such.

d)

It is possible only in Oracle.

2.

After creating Labor and Part line, is it necessary to put a Tick mark to add that in the Estimate?

a)

It is not necessary as mentioned in the training.

b)

There is no option as such.

c)

Yes it is necessary.

d)

Tick mark applicable only for labor line.

3.

Is there any possibility to edit the labor price.

a)

No possible as mentioned in the training.

b)

It is possible to edit the labor price in I-pad.

c)

It is possible to edit the labor price in Oracle.

d)

Both B and C are correct.

4.

How many tasks can be created for the video estimation?

a)

Maximum of 10.

b)

Minimum of 10 should be created.

c)

No limitation are set.

d)

None of the above.

5.

How many part lines can be created in a Task line?

a)

There is no limitations in creating the part lines.

b)

Only one part line can be added in one task line

c)

There is option to add any part lines.

d)

None of the above.

6.

Estimation cannot be created if there are no photos or videos are attached.

a)

Yes as mentioned in the training.

b)

No as mentioned in the training.

c)

At least one photo should be attached

d)

None of the above.

7.

Is there any option to change the job Severity in I-pad?

a)

There is no Severity option giving in the Video estimation.

b)

Yes there is an option given to change the Severity level in i-pad.

c)

It can be changed only in Oracle and not in I-pad

d)

Both B and C are False.

8.

Estimation can be created only if the approved part lines are validated by the parts dept.

a)

There is no validation required from the parts department.

b)

Parts department should validate all estimation to create.

c)

Parts department should validate only if there is any part lines sent for approval.

d)

None of the above.

9.

Will this new feature in e-estimate reduce the creation time

a)

Process is getting complicated

b)

User friendly and time saving

c)

Kills the time

d)

Both a and c

10.

How many e-estimate can you make in a day with this new feature

a)

1

b)

Less than 5

c)

More than 95% of manual estimate

d)

Maximum 5