What is full form of SOP ?
Safe Operating practice
Safe Operating Procedure
Safe Operating Practice
Standard Operating Procedure
Responsiblility of Implementation of this SOP does not lie with ?
Site Engineer
Site Supervisor
Site Incharge
EHSO
A person who has adequate qualification, Skill and Experience in particular activity is called
Experienced Person
Skilled Person
Qualified Person
Competent Person
A Work Zone that shall be identified for the work by site engineer/Site Supervisor is called
Battery Zone
Safe Limit
Battery Limit
Safe Zone
A Line having Voltage of more than 6.6 kV is called as
High Tension Line
Low Tension Line
Mega Tension Line
Medium Tension Line
What is full form of PPEs?
Personal Protective Equipment
People Protection Equipment
Personal Protection Equipment
People Protective Equipment
What is DTR ?
Double Transformer
Distribution Transformer
Double Transportation
Distribution Transportation
Which rung from the top of the Ladder our worker should not climb ?
1st Rung
2nd Rung
3rd Rung
4th Rung
All the Tools which are used by the fitter should have ?
Conduction
Red Colour
Black Colour
Insulation
The responsibility of Screening Lies with whom ?
EHSO
Site Engineer
TIme Office
Store Keeper
What is the first activity that the site supervisor should do in the site ?
Pep Talk
Tool Box Talk
Work Instruction
Work Method
Before Issuing the tokens the site supervisor should send which message in the group ?
Safe to start message
safe to stop message
Man power message
Observation message
Green colour token must be issued to which worker and which condition ?
Height Worker in Non LC Condition
Ground Worker in LC Condition
Height Worker in LC Condition
Ground Worker in Non LC Condition
Where is Green Flag used ?
Starting pole of Battery Limit
Ending Pole of Battery Limit
Transformer Location
None of the given options
What does red flag mean ?
Do not climb the pole
start the work
stop the work
Take rest
In which situation LC is compulsory ?
LT Line
HT Line
Damaged Poles
Rail Poles
For Multi Circuit Poles what should be done ?
LC for HT Line
LC for LT Line
LC for both the Lines
No LC Needed
Which Rung of the Ladder must be painted in Red ?
3rd from the Top
3rd from the Bottom
2nd from the Top
2nd from the Bottom
In what situations our Staff/Supervisor is compulsory ?
HT/LT Shutdown
Major Highways
Forest Area
Working in Populated Areas
All the given options
For 11kV Line single circuit what is the clearance should be maintained ?
750mm
1000mm
500mm
850mm
For 33kV Line single circuit what is the clearance should be maintained ?
500mm
750mm
1000mm
250mm
For LT Line what is the clearance should be maintained ?
750mm
400mm
300mm
1000mm
For 11kV/LT Multi circuit what is the clearance should be maintained ?
750mm
1000mm
400mm
350mm
What is the full form of LC ?
Line Clearance
Line of Control
Line of Conduct
Line Circuit
Did you understand the revised SOP?
Yes
No
Which rules should not be bypassed violated under any circumstances intentionally or unintentionally ?
Safety Rules
Cardinal Rules
Mandatory rules
Strict rules
Which stick should be used for measuring safe clearance?
Wooden Stick
PVC Stick
Metal Stick
Fiber Stick
Which rope should be present hanging to pull the material upwards or downwards ?
Guy Rope
Loose Rope
Metal Rope
Plastic Rope
Which rule is used when using ladders ?
4 to 1 rule
3 to 1 rule
5 to 1 rule
2 to 1 rule
Which rule is used when using Ladder?
4 Points of contact
3 points of contact
5 points of contact
2 points of contact
Which accessory is used while laying the cable across the road ?
Bamboo Stick
Roller Pulley
Ropes
Fiber Stick
What are the measures taken when there are in line transformers ?
Re routing the line
Excluding the pole from fixing the clamp
Shutdown/LC
All of these
What are the 2 types of Shutdowns that we do in our job ?
LT Shutdown
HT Shutdown
Electric Shutdown
Power Shutdown
What should be the minimum dia of MS Spike rod ?
10mm
20mm
16mm
30mm
How much depth the Spike rod should be inserted into the ground ?
1200 mm
2000 mm
1000 mm
800 mm
Even after obtaining LC for the feeder from the Substation, what are the potential chances for the presence of current in the Conductor ?
Line Crossings
Back Feeding sources
Induction from Extra High Voltage Lines
All the given options
This System is called as
TOLO System
LOTO System
POTO System
TOPO System
Which of the following is Electric rated Hand gloves?
Which Activity is Carried out in the given picture ?
LC
Non LC
What is this called ?
VLC Media Player
Safety Tower
Safety pillar
Safety Cone
Daily EHS Report is a legal Defense in favour of
Organization
Staff
Sub contractor
Workmen
All the Options
What is PTW ?
Permit To Work
Position To Work
Permit To Workman
None of These