Tank and Jetty Overview

Total questions: 10

Worksheet time: 6mins

Name
Class
Date
1.

Some products than handle at Jetty C are :

a)

Py Gas, Butene-1, HPC3, LPC2

b)

Naphtha, LPC3, Py Gas, Butene-1

c)

LPC2, LPC3, n-Hexane, Naphtha

d)

Butene-1, n-Hexane, Py Gas, LPC3

2.

Supporting facility during berthing ship/vessel are, except

a)

Tug Boat

b)

Pilot Boat

c)

Speed Boat

d)

Mooring Boat

3.

Some products handling at jetty B are, except

a)

Naphtha

b)

CC4

c)

C3LP

d)

C3HP

4.

Nature factors that should be considered when berthing vessel are, except

a)

Berthing angle

b)

Direction and wind strength

c)

Direction and wave strength

d)

Wave height

5.

Guarantee spec for export product was based on

a)

Ship

b)

Shore

c)

Port

d)

Ullage

6.

Shipment quantity used for reporting when we export Pygas product is

a)

Ullage quantity

b)

Ship figure quantity

c)

Shore tank quantity

d)

No correct answer

7.

Shipment quantity used for reporting for 1.3 BD material both export/import is

a)

No correct answer

b)

Shore figure quantity

c)

Ullage quantity

d)

Bill of lading quantity

8.

Min-Max inventory range for HPC2 and HPC3 are

a)

150-1500 Ton and 450-3000 Ton

b)

1500-4000 Ton and 350-1000 Ton

c)

450-2000 Ton and 1500-4000 Ton

d)

450-1500 Ton and 1000-4000 Ton

9.

How much total C3 tank at CAP plant ?

a)

5

b)

6

c)

7

d)

8

10.

LPC2 MT Gaschem Shinano arrived at Anyer at beg of laycan (4-6 Oct 2018) with NOR +6h and laytime allow 24h also demurrage 20 K$ PDPR. But due to jetty C occupied by C3HP vessel then the vessel MT Gaschem Shinano commences at 5 Oct 18:00 and hose off at 6 Oct 18:00. How much estimated demurrage cost for this LPC2 vessel?

a)

24 K$

b)

26 K$

c)

28 K$

d)

30 K$