At least one door of the residence shall be:
30" wide
36" wide
40" wide
44" wide
Sleeping areas without exterior doors shall have:
Windows at least 4' wide.
Windows to the floor line.
Windows designed for emergency escape.
Windows that will swing outward for escape.
If a structure is constructed over a crawl space, the minimum distance between the grade and floor joists is generally:
18"
24"
30"
36"
Occupancy is based on a minimum of how many people (IRC)?
1
2
3
none
Which of the following is an acronym for a Building Code Organization?
IRC
ANSI
ADDA
ASTM
What should you do prior to starting any design work on a residence?
Find an available contractor
Get the latest codes from the IRC
Get a contract with the owner
Contact the local building official
Commercial Construction with a second floor accessible to the public is required to have a(n) _______to meet ADA requirements.
Hydraulic Lifts
Ramps
Elevator
Stairs
What does the acronym ADA represent?
All Disabled Adults
Americans with Disabilities Act
Alternative Design Arrangements
Alternative Design Audit
The maximum slope of a handicapped ramp in commercial construction is:
6" rise per 10'-0" of horizontal distance
1'-0" rise per 15'-0" of horizontal distance
1'-0" rise per 12'-0" of horizontal distance
Ramps are not allowed in commercial construction
occupancy is based on how many persons for the second bedroom?
1
2
3
none
Which of the following is considered a live load?
Shingles
Floor coverings
Walls
People
Habitable residential space shall have a minimum ceiling height of:
7'-0"
7'-4"
7'-6"
8'-0"
Kitchens, halls, bathrooms and toilet compartments shall have a minimum ceiling height of:
6'-8"
7'-0"
7'-8"
8'-0"
The wall between a garage and livable space shall be which of the following?
Built as a 1-hour fire wall.
Built with non-combustible materials.
Built of masonry construction.
Built without openings.
Designing a structure to ADA requirements allows for accessibility by disabled persons.
True
False
Wood members that contact masonry or concrete must be pressure-treated.
True
False
Every sleeping room shall have a smoke detector.
True
False
Residential hallways must be minimum of 36" clear width. (17-18)
True
False
The occupancy group specifies by whom or how the structure will be used.
True
False
The minimum width of a habitable room is 8'-0".
True
False
Doors should always open onto the stair side of the opening.
True
False
Accessible Route is the path from the exterior through the building.
True
False
CO2 detector are not required under any condition.
True
False
Each door shown on a floor plan must be:
Left hand doors
Numbered
Right hand doors
Drawn with heavy lines
Each window shown on a floor plan must be:
Vinyl
Energy star compliant
Numbered
Drawn with heavy lines
Each room shown on a floor plan must be:
Drawn with heavy lines
Fire resistant
ADA accessible
Numbered
Interior Gypsum or Drywall is typically finished with what?
Paneling
Stucco
Wall paper
Paint
Ceramic tile would typically be found in what space?
Bedroom
Dining room
Bathroom
Living room
Dead bolts would normally be required on what doors?
Exterior
Closet
Bathroom
Bedroom
Finish schedules should always include:
Colors
Owners preference of product
Dollar allowance product
All the options
Windows schedules should include what?
Accessories
Frame material
Size of window
All the options
Door schedules should include what?
Hardware
Material
Size of door
All the options
When developing a finish schedule, the finishes are chosen and controlled by:
The designer
The contractor
The owner
The Architect
Which of the following designates a 30" high x 24" wide window?
W3024
W30x24
W2430
W24x30
The window designation W3660 would indicate what? (18-13)
Rough opening size
General opening size
Finished window size
Operable sash size
A window schedule will typically include:
Type of window
Width and height
Reference letter
All of the options
Sizes listed for doors and windows are generally:
Exact sizes
Nominal sizes
Rough opening sizes
Finish opening sizes
Laminate flooring is a modern substitute for what?
Sub flooring
Bathroom tile
Hardwood floors
Kitchen floor covering
Identify the door.
Slab panel door
Colonial door
French door
Six panel door
Identify the door.
Two panel door
Craftsman door
Colonial door
Slab panel door
Identify the door.
Craftsman door
Colonial door
Four panel door
Slab panel door
Standard residential door height is 6'-8".
True
False
Standard interior door width is 3'-0".
True
False
A schedule key is another name for the numbers or letters in a schedule.
True
False
A room is 9'x12'. How many square yards of carpet are needed for the room?
9
12
90
120
A room is 9'x12'. Baseboard is purchased in 8'-0" lengths. How many pieces are needed for the room?
5
6
7
8
A room is 9'x12'. Tile is 12"x12". How many tiles are needed for the room?
106
108
118
120
A room is 9'x12'. Crown molding is 7'-0" long. How many pieces are needed for the room?
5
6
7
8
Base boards cost $2.00/foot and are 7'-0" long. What is the cost of 8 baseboards?
$76.00
$108.00
$112.00
$142.00
A wall is 20'-0" long. Studs are placed 16" o/c. What is the quantity of studs along the wall?
14
15
16
17
5 dimensions make up the total width of a house: 8'-6", 3'-5", 10'-0", 3'-7", 5'-6". What is the width of the house?
30'-5"
30'-7"
31'-0"
31'-6"
How many square feet are contained in 8 yards of carpet? (19-8)
48
60
72
76
How many cubic feet are contained in 3 cubic yards?
72
81
90
96
A roof surface is 275 sq.ft. How many bundles of shingles will be required to cover the roof?
8
9
10
11
A roof surface is 275 sq.ft. How many bundles of shingles will be required to cover the roof?
8
9
10
11
Carpet costs $1.00/sq ft. You purchased 40 yards of carpet. What is the total cost?
$240.00
$290.00
$360.00
$385.00
What is the square footage of the triangle?
20 sq. ft
40 sq. ft
80 sq. ft
100 sq. ft
What is the square footage of the house shown?
180
200
210
240
What is the square footage of the shape?
30 sq/ft
42 sq/ft
50 sq/ft
55 sq/ft
Specifications govern the drawing notes.
True
False
Finish schedules are considered specifications.
True
False
The color of the roof shingles would be found on the color chart.
True
False
Specifications can be provided on a drawing.
True
False
Specifications are always necessary in some form.
True
False
The owner has final approval of the specifications.
True
False
Coarse stone type material used in concrete is called:
Stone
Gravel
Aggregate
Sand
The space between the upper ceiling and roof is:
Vent area
Access
Crawl space
Attic
Unit of measure for lumber which equals 1" x 1" x 12":
Running foot
Square foot
Board foot
1 x 12
Short pieces of lumber nailed between joists to add additional support are: (20-4)
Braces
Blocking
Stiffeners
Kickers
Which of the following is another term for Drywall?
OSB
Gypsum
Plaster
Concrete board