wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

TMR Trivia

Total questions: 10

Worksheet time: 4mins

Name
Class
Date
1.

How many Local Government's does Darling Downs TMR incorporate?

a)

5

b)

4

c)

3

d)

2

2.

Who is our current District Director?

a)

Donald Duck

b)

Grant Wren

c)

Terry Watt

d)

Dereck Sanderson

3.

Our longest serving current employee has a TMR career of?

a)

46 years

b)

41 years

c)

33 years

d)

31 years

4.

The recently completed Toowoomba Bypass had a construction cost of:

a)

$2.522 billion

b)

$4.5 million

c)

$2.16 billion

d)

$1.61 billion

5.

The Queensland state-controlled road network is the state’s most valuable public asset. As at 30 June 2019, what was the gross replacement cost of the network?

a)

$41.39 billion

b)

$12.25 billion

c)

$200 billion

d)

$75.71 billion

6.

Of Queensland’s 33,369km state-controlled road network, how much sits within the Darling Downs District?

a)

3,847km

b)

4,259km

c)

5,684km

d)

6,787km

7.

Which of the following is NOT a generic project management stage in OnQ methodology?

a)

Concept Phase

b)

Integration Phase

c)

Development Phase

d)

Implementation Phase

e)

Finalisation Phase

8.

Number of bridges on the TMR network across the Darling Downs District?

a)

103

b)

158

c)

175

d)

225

9.

The Darling Downs District covers an area of roughly:

a)

72,594km2

b)

79,661km2

c)

85,119km2

d)

96,956km2

10.

The Leichhardt Highway (Miles - Goondiwindi) is our longest road section, spanning...

a)

119.58km

b)

158.44km

c)

179.69km

d)

224.14km