Unit 210 How to communicate with others in BSE

Total questions: 21

Worksheet time: 21mins

Name
Class
Date
1.

Who is considered the most important person in the construction team?

a)

Client

b)

Clerk of works

c)

You

d)

Architect

2.

Which of the following is the role of an Architect

a)

They liaise with the client regularly at the early stages, and throughout the project

b)

Ensure the building is constructed as per the drawings, standard of work and quality of materials

c)

They calculate loads, forces, variances from wind and rain, looking at structural safety

d)

They have to position the building on the land, and ensure Building Regulations are followed throughout the process

3.

Which of the following is the role of an Surveyor?

a)

They liaise with the client regularly at the early stages, and throughout the project

b)

Ensure the building is constructed as per the drawings, standard of work and quality of materials

c)

They calculate loads, forces, variances from wind and rain, looking at structural safety

d)

They have to position the building on the land, and ensure Building Regulations are followed throughout the process

4.

Which of the following is the role of an Structural engineer?

a)

They liaise with the client regularly at the early stages, and throughout the project

b)

Ensure the building is constructed as per the drawings, standard of work and quality of materials

c)

They calculate loads, forces, variances from wind and rain, looking at structural safety

d)

They have to position the building on the land, and ensure Building Regulations are followed throughout the process

5.

Which of the following is the role of an Clerk of works?

a)

They liaise with the client regularly at the early stages, and throughout the project

b)

Ensure the building is constructed as per the drawings, standard of work and quality of materials

c)

They calculate loads, forces, variances from wind and rain, looking at structural safety

d)

They have to position the building on the land, and ensure Building Regulations are followed throughout the process

6.

Which of the following regulation relate to plumbing?

a)

Water regulations

b)

Building regulations

c)

Gas regulations

d)

all of the above

7.

Building regulation part L relates to?

a)

Electrical safety

b)

Combustion appliances and fuel storage systems

c)

Sanitation, hot water safety and water efficiency

d)

Conservation of fuel and power

8.

Building regulation part P relates to?

a)

Electrical safety

b)

Combustion appliances and fuel storage systems

c)

Sanitation, hot water safety and water efficiency

d)

Conservation of fuel and power

9.

Building regulation part G relates to?

a)

Electrical safety

b)

Combustion appliances and fuel storage systems

c)

Sanitation, hot water safety and water efficiency

d)

Conservation of fuel and power

10.

Building regulation part J relates to?

a)

Electrical safety

b)

Combustion appliances and fuel storage systems

c)

Sanitation, hot water safety and water efficiency

d)

Conservation of fuel and power

11.

Building reg part L states that all pipe work within what distance must be insulated?

a)

1m

b)

2m

c)

1.5m

d)

No requirement.

12.

The water regs are design to prevent?

a)

Waste, Misuse, Undue consumption, Contamination, Erroneous measurement

b)

Waste, Bad practice, Undue consumption, Contamination, Erroneous measurement

c)

Waste, Misuse, Undue consumption, Contamination, Erroneous workmanship

d)

Waste, Misuse, Undue conservation, Contamination, Erroneous measurement

13.

Which of the following shows the information shown on a work program?

a)

Progress of the work on site, indicating a clear start and finish date for each of the trades and the activities they should be doing

b)

Plans, elevations and details needed by the contractor – along with the specification – to enable them to carry out the work

c)

Contain details of hours worked, description of work carried out, and at which site. They are used to calculate wages and used for future estimates

d)

A description of the installation being quoted for, containing the materials and appliances

14.

Which of the following shows the information shown on a Job specification?

a)

Progress of the work on site, indicating a clear start and finish date for each of the trades and the activities they should be doing

b)

Plans, elevations and details needed by the contractor – along with the specification – to enable them to carry out the work

c)

Contain details of hours worked, description of work carried out, and at which site. They are used to calculate wages and used for future estimates

d)

A description of the installation being quoted for, containing the materials and appliances

15.

Which of the following shows the information shown on a Timesheet?

a)

Progress of the work on site, indicating a clear start and finish date for each of the trades and the activities they should be doing

b)

Plans, elevations and details needed by the contractor – along with the specification – to enable them to carry out the work

c)

Contain details of hours worked, description of work carried out, and at which site. They are used to calculate wages and used for future estimates

d)

A description of the installation being quoted for, containing the materials and appliances

16.

Which of the following shows the information shown on a Working drawings?

a)

Progress of the work on site, indicating a clear start and finish date for each of the trades and the activities they should be doing

b)

Plans, elevations and details needed by the contractor – along with the specification – to enable them to carry out the work

c)

Contain details of hours worked, description of work carried out, and at which site. They are used to calculate wages and used for future estimates

d)

A description of the installation being quoted for, containing the materials and appliances

17.

1. When installing an appliance, which document would you reference for the installation instructions?

a)

BS 6700

b)

The Water Regulations

c)

Manufacturers’ instructions

d)

Works programme.

18.

The main purpose of the works programme is to

a)

State when payments are due

b)

Provide clear indication of when an activity should start and finish

c)

Assist the plumber in calculating the amount of materials required

d)

Assist the contractor in planning the number of personnel that may be required.

19.

A new employee in a company would normally be given which of the following documents?

a)

Health and Safety at Work Act

b)

Bill of quantities

c)

Contract of employment

d)

Quotation

20.

Which one of the following organisations specialises in impartial advice concerning employment difficulties?

a)

CITB

b)

JIB

c)

ACAS

d)

UKAS

21.

If there was a dispute between an employee and an employer, who could be used in the discussions?

a)

Trade Union

b)

Employment control officer

c)

Health and safety representative

d)

Employee’s family.