1.

Select two (2) requirements basic equipment maintenance.

a)

Lubrication

b)

Bolting (tightening)

c)

Overhauling

d)

Replace a new equipment

2.

Select two (2) benefits of operator maintenance programs.

a)

Uninterrupted production

b)

Reliable and safe operation

c)

Increase the maintenance cost

d)

Many breakdowns occur with unplanned downtime

3.

Select two (2) maintenance duties of process technician

a)

Measure overall vibration using data collectors

b)

Adjust tension and replace V-belts

c)

Sampling and testing

d)

Failure to clear work areas before reactivation of equipment

4.

Select two (2) functions of lubricant

a)

Dampen shock

b)

Flush out contaminants

c)

Protect equipment from explosions

d)

To maintain the cleanliness of equipment

5.

Select two (2) major lubricating system designs.

a)

Pressure lubrication

b)

Gravity lubrication

c)

Visual lubrication

d)

Vacuum lubrication

6.

Choose the functions of lubricant normally use while maintaining the process plant equipment.

a)

Lubricants reduce heat by reducing friction that generates heat, plus the lubricating oil also carries heat away from the moving parts

b)

Lubricants used to verify the tightness of specimens or the location of leaks.

c)

Lubricants used to control fluid flow by varying the size of the flow passage as directed by a signal from a controller

d)

Lubricants used as fuel for generating electricity and heat.

7.

Select two (2) techniques for unplugging and cleaning piping and equipment that commonly use.

a)

Pressure technique

b)

Mechanical methods

c)

Friction technique

d)

Specific graviity technique

8.

Select two (2) problems that could occur by excessive piping vibration

a)

Pipes can be knocked off their supports

b)

Threaded connections can loose

c)

Sparks and arcs may ignite

d)

Loud sounds may exist

9.

Select two (2) impacts on bottom-line costs by improve the rotating equipment reliability

a)

Reduces maintenance costs

b)

Reduces equipment acquisition costs

c)

Reduces mean-time-between-repair

d)

Increases purchasing and inventory activities

10.

Select two (2) common failures most often for a centrifugal pump

a)

Bearing and wear ring damage

b)

Mechanical seals leakage

c)

Overheating

d)

Running in reverse

11.

Select two (2) of steam traps

a)

Float trap

b)

Fixed orifice trap

c)

Thermometer trap

d)

Dynamic trap

12.

Select two (2) methods for troubleshooting steam traps.

a)

Temperature measurement

b)

Smell

c)

Observation

d)

Using gas leak detector