Total questions: 45

Worksheet time: 23mins

Name
Class
Date
1.
Which statement is true about work in process (WIP) limits?
a)
Higher WIP limits provide richer feedback
b)
Higher WIP limits result in lower utilization
c)
Lower WIP limits result in fewer Stories being completed
d)
Lower WIP limits improve flow
2.
Why do Lean-Agile leaders try to connect the silos of business, system engineering, hardware, software, test, and quality assurance?
a)
To optimize vertical communication
b)
To align around value
c)
To enforce organizational boundaries between functions
d)
To allow friction between the teams
3.
What is the goal of the SAFe House of Lean model?
a)
Innovation
b)
Relentless Improvement
c)
Flow
d)
Value
4.
Which statement is true about the PI Planning event?
a)
It involves program Portfolio Management to prioritize the Stories presented by teams during the final plan review
b)
It involves everyone in the program over a two-day period
c)
It involves Product Management and Product Owners on the first day and the rest of the teams on the second day
d)
It involves only the team members who are most qualified to estimate the work
5.
Which activity is key to successfully implementing the Scaled Agile Framework?
a)
Remove blocks such as portfolio estimation
b)
Replace the PI Planning process with the Inspect and Adapt workshop when possible
c)
Use a cadence-based PI Planning process
d)
Use the Innovation and Planning Iteration instead of the PI Planning process
6.
What is the benefit of separating release elements from the Solution?
a)
It allows Agile Teams to launch untested Features
b)
It allows the release of different Solution elements at different times
c)
It allows the Systems Team to integrate with ease
d)
It allows the Agile Release Train to demo value every two weeks
7.
An Agile Team collects the Iteration Metrics they have agreed upon during which part of the team retrospective?
a)
During the quantitative part of the team retrospective
b)
During the Features agreement retrospective
c)
During the time and materials retrospective
d)
During the qualitative part of the team retrospective
8.
Which factor helps unlock the intrinsic motivation of knowledge workers?
a)
Team performance incentives
b)
Pay-for-performance
c)
Parallel development
d)
Autonomy
9.
How does relentless improvement support value in the SAFe House of Lean?
a)
It optimizes the whole
b)
It uses informed decision-making through fast feedback
c)
It builds long-term partnerships based on trust
d)
It allows teams to pivot without mercy or guilt
10.

Which two statements describe the responsibilities of the Product Owner? (Choose two.)

a)

To protect the team from external forces

b)

To own and manage the Team Backlog

c)

To be a single voice for the Customer and stakeholders

d)

To coach the team

e)

To ensure the team follows Agile principles and practices

11.

What are two reasons Agile development is more beneficial than waterfall development? (Choose two.)

a)

It allows management to track project progress based on steering committees and metrics

b)

It increases productivity and employee engagement

c)

It allows businesses to deliver value to the market more quickly

d)

It requires phase-gate approvals to ensure that everyone is moving together

e)

It relies on external provider dependencies

12.
What is critical to successfully implementing quality in a Lean-Agile environment?
a)
Separation of Dev and Ops
b)
Component teams
c)
Making quality everyone’s responsibility
d)
A phased-gate rollout
13.
What is one of the typical Kanban classes of service for Agile teams?
a)
Funnel
b)
Accepted
c)
Fixed-date
d)
Review
14.
The Inspect and Adapt event always starts with which activity?
a)
Retrospective and Problem Solving Workshop
b)
Agreement on the problems to solve
c)
Quantitative measurement
d)
The PI System Demo
15.
Which statement describes a cadence-based PI Planning event?
a)
It is very important and should be postponed until all participants can attend
b)
As many team members as possible should attend remotely to reduce travel costs
c)
It is an all-hands, two-day event with the goal to create alignment
d)
It is not a required event but tasks move forward at higher velocity when the meeting occurs
16.
What is typically included in the definition of done for the team increment?
a)
Customer documentation is ready
b)
Regression testing is done
c)
Stories are accepted by Product Management
d)
Stories are accepted by the Product Owner
17.
Why is the modified Fibonacci sequence used when estimating?
a)
It serves as a way to estimate large ranges
b)
It reflects the uncertainty in estimating larger items
c)
It can be used to predict unit test coverage
d)
It results in greater precision
18.
What are the three levels of the Scaled Agile Framework?
a)
Essential, Large Solution, Portfolio
b)
Epic, Capability, Feature
c)
Framework, Delivery, Iteration
d)
Value Stream, Program, Team
19.
What is the role of the Scrum Master?
a)
To coordinate Portfolio Epics through the Portfolio Kanban system
b)
To facilitate Agile Release Train processes and Solution Train execution
c)
To be a stakeholder who has the primary business and technical responsibility for fitness for use
d)
To act as a servant leader who helps teams self-organize, self-manage, and deliver using effective Agile practices
20.
James is a Product Owner. It is day seven of the Iteration and his team tells him that they may miss their Iteration commitment. What should James do?
a)
Support adding an Innovation and Planning Iteration directly after the current Iteration
b)
Ensure the Iteration backlog is accurately prioritized
c)
Support splitting a Story into a coding story and a testing story, and then moving the testing story into the next Iteration
d)
Agree to add a person from the System Team to complete the work
21.
Which responsibility belongs to the Product Owner in the team?
a)
To facilitate team meetings and drive Agile behavior
b)
To foster adoption of Agile technical practices
c)
To foster normalized estimating within the team
d)
To sequence backlog items to program priorities, events, and dependencies
22.
What are the SAFe Core Values?
a)
Built-in Quality, Program Execution, Alignment, Transparency
b)
Code Quality, Fast Feedback, Alignment, Trust
c)
Commitment, Competency, Collocation, Culture
d)
People and Culture, Transparency, Collaboration, Responding to Change
23.
Which practices are demonstrated during the Inspect and Adapt event?
a)
Forward focus, develop, cross-domain plan, and expedite execution
b)
Reflect, problem solve, and identify improvement actions
c)
Move forward, analyze future Stories, integrate, and iterate
d)
New start, job sequence, funnel, and enable
24.
What replaces detailed requirements documents?
a)
Stories
b)
Pair work
c)
Unit tests
d)
Task boards
25.
Iteration planning, Iteration review, and backlog refinement are examples of which type of event?
a)
Program event
b)
PI event
c)
Team event
d)
Sync event
26.
Quality is first and foremost a function of what in a Lean-Agile concept?
a)
Culture of shared responsibility
b)
Preserving options
c)
Empowered Solution authority
d)
Deployment on demand
27.

Which three questions should each team member answer during the daily stand-up? (Choose three.)

a)

Are there any impediments that will prevent the team from meeting the Iteration goals?

b)

What did I do yesterday to advance the Iteration goals?

c)

How am I splitting the Solutions into Capabilities and Enablers?

d)

What will I do today to advance the Iteration goals?

e)

How I am contributing to an environment of continuous change?

28.
What is the recommended size of an Agile Team?
a)
10 – 15 people
b)
8 – 12 people
c)
3 – 5 people
d)
5 – 11 people
29.

The "3 Cs" is a popular guideline for writing user stories. What does each of the three Cs represent? (Choose three.)

a)

Card

b)

Clarification

c)

Conversation

d)

Concept

e)

Confirmation

30.
What is the role of the System Architect/Engineer?
a)
To guide the teams and support the Architectural Runway
b)
To manage dependencies
c)
To define the design for the system
d)
To implement continuous improvement methods
31.
If the PI System Demo shows the current state of the Solution, then who is this demo intended for?
a)
The Business Owners
b)
The Product Owner
c)
The Scrum Masters
d)
The Agile Team
32.

Which two views does the Iteration review provide into the program? (Choose two.)

a)

How the team is responding to the stakeholders

b)

How the team is doing on the Program Increment

c)

How the team is demonstrating transparency of decision-making

d)

How the team is increasing empowerment

e)

How the team did on the Iteration

33.
What is an example of a program event?
a)
Innovation and Planning
b)
Daily stand-up
c)
Iteration review
d)
Scrum of scrums
34.
During Iteration execution, a team’s velocity tends to be most affected by what?
a)
Productivity changes, team location, and innovation measures
b)
Changing team size, team makeup, and technical context
c)
Changing financial planners, a new Scrum Master, and new testers
d)
Product Owner changes, changing estimations, and new Features
35.
What is an example of a modified Fibonacci sequence?
a)
...1, 1, 3, 5, 5...
b)
... 2, 4, 5, 9, 11...
c)
..5, 8, 13, 21, 34...
d)
..5, 8, 13, 20, 40...
36.
Which statement describes one element of the CALMR approach to DevOps?
a)
ld cross-functional Agile Release Trains around the flow of value to the Customer
b)
Decentralize decision making
c)
Keep everything under version control
d)
Establish a work environment of shared responsibility
37.
Which statement is true about Iteration planning for Kanban teams?
a)
Kanban teams estimate their velocity
b)
Kanban teams publish Iteration goals
c)
Kanban teams do not commit to service level agreements
d)
Kanban teams find high value in trying to plan the Iteration in detail
38.
What visibility should Scrum Masters provide during the Agile Release Train Sync?
a)
Visibility into system Solution Intent
b)
Visibility into collaboration deployment
c)
Visibility into progress and impediments
d)
Visibility into single source design decisions
39.
The Agile Release Train aligns teams to a common mission using a single Vision and what else?
a)
Release on Demand
b)
Weighted shortest job first
c)
Program Backlog
d)
Team Backlogs
40.
How can a technical exploration Enabler be demonstrated?
a)
Exploration Enablers do not need to be demonstrated
b)
Show the knowledge gained by the exploration
c)
Demonstrate working systems in the production environment
d)
Show the acceptance tests written for the exploration
41.
What is the role of the Release Train Engineer?
a)
To serve as the Scrum Master for the Agile Release Train
b)
To ensure the technical integrity of all development in the Agile Release Train
c)
To serve as the content authority at the Program Level
d)
To coach teams to improve their results
42.
What is the purpose of the Iteration review?
a)
To measure the team’s progress by showing working Stories to the stakeholders and getting feedback from them
b)
To serve as a forecasting meeting where the work is estimated for the Program Increments
c)
To identify where there is too much work in the system and where the teams are being overloaded
d)
To show the backlog items and work on possible Solutions for the backlog items
43.
A cumulative flow diagram focuses on which curves?
a)
Arrival curve (“to-do”) and departure curve (“done”)
b)
Backlog curve ("work") and departure curve ("done")
c)
Arrival curve ("to do") and evolution curve ("change")
d)
Implementation curve ("movement") and departure curve ("done")
44.
When should a component team be used?
a)
To create each replaceable component with minimized dependencies
b)
To gain the fastest velocity with well defined interfaces
c)
To develop T-shaped skills together with Continuous Integration
d)
To obtain high reuse and technical specialization with a focus on nonfunctional requirements
45.
Which statement reflects one of the steps for setting initial velocity?
a)
Identify work on technical infrastructure, tooling, and other systemic impediments
b)
Maintenance tasks do not need to be included in velocity; maintenance tasks fall outside this scope
c)
The team members assess their availability, acknowledging time off and other potential duties
d)
Determining velocity is a new function in each Iteration; previous Iterations should not be transferred to a new Iteration