Feasibility study
This involves breaking down the system pieces to analyse the situation, project goals in an attempt to engage users so that the definite requirements can be defined
Involves building the software, distribution installing the software, configuring the software and testing the software
This step involves determining the costs, benefits, resource requirements and user needs required for completion
Delivers software to end users and more adjustments can be made. This involves giving people who will use it training. After the system is placed in it's final environment
Requirements Analysis
Delivers software to end users and more adjustments can be made. This involves giving people who will use it training. After the system is placed in it's final environment
Tests for defects against the products specification so bugs and defects are detected and removed. This includes unit, system and user acceptance testing.
Involves building the software, distribution installing the software, configuring the software and testing the software
This involves breaking down the system pieces to analyse the situation, project goals in an attempt to engage users so that the definite requirements can be defined
Design
Turns specifications into a design plan. All stake holders review the plan and offer feedback and suggestions. The output of this stage will describe the new system as a collection of modules
Involves building the software, distribution installing the software, configuring the software and testing the software
This step involves determining the costs, benefits, resource requirements and user needs required for completion
This involves breaking down the system pieces to analyse the situation, project goals in an attempt to engage users so that the definite requirements can be defined
Development
Turns specifications into a design plan. All stake holders review the plan and offer feedback and suggestions. The output of this stage will describe the new system as a collection of modules
Involves building the software, distribution installing the software, configuring the software and testing the software
This step involves determining the costs, benefits, resource requirements and user needs required for completion
Delivers software to end users and more adjustments can be made. This involves giving people who will use it training. After the system is placed in its final environment
Test
Involves building the software, distribution installing the software, configuring the software and testing the software
Turns specifications into a design plan. All stake holders review the plan and offer feedback and suggestions. The output of this stage will describe the new system as a collection of modules
This step involves determining the costs, benefits, resource requirements and user needs required for completion
Tests for defects against the products specification so bugs and defects are detected and removed. This includes unit, system and user acceptance testing.
Deployment
Turns specifications into a design plan. All stake holders review the plan and offer feedback and suggestions. The output of this stage will describe the new system as a collection of modules
This involves breaking down the system pieces to analyse the situation, project goals in an attempt to engage users so that the definite requirements can be defined
Delivers software to end users and more adjustments can be made. This involves giving people who will use it training. After the system is placed in its final environment
Involves building the software, distribution installing the software, configuring the software and testing the software
Maintain
This involves breaking down the system pieces to analyse the situation, project goals in an attempt to engage users so that the definite requirements can be defined
Delivers software to end users and more adjustments can be made. This involves giving people who will use it training. After the system is placed in its final environment
The software is improved and can be updated to fit new requirements.
Involves building the software, distribution installing the software, configuring the software and testing the software
What is Waterfall
An iterative approach to software development. It compromises various approaches to software development under which requirements and solutions evolve through collaborative efforts.
An iterative and incremental software development process framework. Each iteration is like a small project and with each iteration, new features arrive
The breakdown of project activities into linear sequential phases, where each phase depends on the deliverables of the previous one. It is less iterative and flexible, as progress flows in one direction
Adapted from the Toyota production system, it offers a solid conceptual framework, values and principles as well as good practice.
What is Agile
An iterative approach to software development. It compromises various approaches to software development under which requirements and solutions evolve through collaborative efforts.
A good model for projects with no end date and unsure requirements. All resources go on the software development and code. it's used on small projects with small teams
Intends to improve software quality, life quality for development team, and responsiveness to changing customer requirements
The breakdown of project activities into linear sequential phases, where each phase depends on the deliverables of the previous one. It is less iterative and flexible. As progress flows in one direction
What is Spiral
The breakdown of project activities into linear sequential phases, where each phase depends on the deliverables of the previous one. It is less iterative and flexible. As progress flows in one direction
A risk driven model that guides a team to adopt elements of one or more process models. Each phase starts with a design goal and ends with the client reviewing the process
A good model for projects with no end date and unsure requirements. All resources go on the software development and code. it's used on small projects with small teams
Adapted from the Toyota production system, it offers a solid conceptual framework, values and principles as well as good practice.
What is unified Process (UP)
A risk driven model that guides a team to adopt elements of one or more process models. Each phase starts with a design goal and ends with the client reviewing the process
Intends to improve software quality, life quality for development team, and responsiveness to changing customer requirements
A good model for projects with no end date and unsure requirements. All resources go on the software development and code. it's used on small projects with small teams
An iterative and incremental software development process framework. Each iteration is like a small project and with each iteration, new features arrive
What is Lean
A risk driven model that guides a team to adopt elements of one or more process models. Each phase starts with a design goal and ends with the client reviewing the process
A good model for projects with no end date and unsure requirements. All resources go on the software development and code. it's used on small projects with small teams
The breakdown of project activities into linear sequential phases, where each phase depends on the deliverables of the previous one. It is less iterative and flexible. As progress flows in one direction
Adapted from the Toyota production system, it offers a solid conceptual framework, values and principles as well as good practice.
What is Big Bang
The breakdown of project activities into linear sequential phases, where each phase depends on the deliverables of the previous one. It is less iterative and flexible. As progress flows in one direction
Adapted from the Toyota production system, it offers a solid conceptual framework, values and principles as well as good practice.
An iterative and incremental software development process framework. Each iteration is like a small project and with each iteration, new features arrive
A good model for projects with no end date and unsure requirements. All resources go on the software development and code. it's used on small projects with small teams
What is the V-model
A risk driven model that guides a team to adopt elements of one or more process models. Each phase starts with a design goal and ends with the client reviewing the process
A good model for projects with no end date and unsure requirements. All resources go on the software development and code. it's used on small projects with small teams
Intends to improve software quality, life quality for development team, and responsiveness to changing customer requirements
An extension of waterfall and is based on each association of a testing phase for each corresponding development stage. The next phase starts when the previous one ends
Kanban
A method for managing the creation of products with an emphasis on continual delivery while not overburdening the development team. It is defined to help teams work together more efficiently
A risk driven model that guides a team to adopt elements of one or more process models. Each phase starts with a design goal and ends with the client reviewing the process
A good model for projects with no end date and unsure requirements. All resources go on the software development and code. it's used on small projects with small teams
An extension of waterfall and is based on each association of a testing phase for each corresponding development stage. The next phase starts when the previous one ends
Advantages of Waterfall
Easy to manage
Client is involved in every stage
Fast delivery
Very flexible
Disadvantages of Waterfall
Not ideal for small projects
It is a complicated model
Very difficult to move back to previous stage
unclear requirements makes it ineffective
Advantages of Agile
Focused on client processed- client is involved in every stage
Very flexible due to iteration
implementation cost is cheap
Ideal for small projects
Disadvantages of Agile
Very difficult to make back to previous stage
Can be excessive preparation and planning
Lack of test automation
Not ideal for large projects
UP advantages
predictable
Very easy to understand
Used a lot
Adaptable to changing requirements
Disadvantages of UP
Complicated to understand
Documentation isn't used
The development process is complex and disorganised
Doesn't adjust to changing requirements
Lean Advantages
Eliminates unnecessary activity
Doesn't require documentation
Team can be of any skill level
Streamlined approach allows more functionality to be delivered in less time
Lean disadvantages
Development team has no power to make decisions
Needs skilled team
Can be very slow
Depends on strong documentation
Big Bang advantages
Great for complex projects
Easy to manage
Cheap
Little resources required
Big Bang disadvantages
Not good for complex or OOP projects
Can be expensive
Needs lots of planning
Difficult to manage
XP advantages
Encourages Teamwork
Small investment time
Uses continuous testing
Good with documentation
XP disadvantages
Slow
Code is more of a focus than design
Expensive
Lack of documentation
Spiral advantages
Can be done with any size of project
Additional functionality or changes can be done at a later stage
Good for complex customer requirements
Process is very simple
Spiral weaknesses
Needs to be followed strictly
Not good with customer feedback
development is very slow
Risk of not meeting budget or schedule
V-model advantages
Simple and easy to understand
Software is produced early in the lifecycle
Good for changing requirements
Highly-disciplined model
V-model Disadvantages
Very hard to manage
Poor model for short projects
Difficult to add or change functionality once project has reached testing
No working software produced until very late into the life cycle
Kanban advantages
Easy to manage due to rigidity of the model
Good for long projects
Has timeframes associated with each phase
Accurately models how work is done
Kanban disadvantages
Doesn't show how work is done
If Kanban board becomes outdated, it can become over complicated
Poor model for short projects
Poor model for long projects
UP - inception stage
The team is expected to capture the system requirements. They should also know the risk factors and should establish and validate the system architecture. The design is also created.
The system is deployed to the target users. Feedback is also received and can result in refinement over several transition periods. This phase also incorporates user training and system conversions
Develops an approximate vision of the system, makes a business case and produces a rough estimate for the cost and schedule
The system is built on the foundations laid in the elaboration phase. User cases are created and each one signifies a new iteration. Each iteration results in a release of the software
UP - Elaboration stage
The system is built on the foundations laid in the elaboration phase. User cases are created and each one signifies a new iteration. Each iteration results in a release of the software
The team is expected to capture the system requirements. They should also know the risk factors and should establish and validate the system architecture. The design is also created.
Develops an approximate vision of the system, makes a business case and produces a rough estimate for the cost and schedule
The system is deployed to the target users. Feedback is also received and can result in refinement over several transition periods. This phase also incorporates user training and system conversions
UP - Construction stage
The team is expected to capture the system requirements. They should also know the risk factors and should establish and validate the system architecture. The design is also created.
Develops an approximate vision of the system, makes a business case and produces a rough estimate for the cost and schedule
The system is deployed to the target users. Feedback is also received and can result in refinement over several transition periods. This phase also incorporates user training and system conversions
The system is built on the foundations laid in the elaboration phase. User cases are created and each one signifies a new iteration. Each iteration results in a release of the software
UP - Transition stage
The system is deployed to the target users. Feedback is also received and can result in refinement over several transition periods. This phase also incorporates user training and system conversions
The system is built on the foundations laid in the elaboration phase. User cases are created and each one signifies a new iteration. Each iteration results in a release of the software
Develops an approximate vision of the system, makes a business case and produces a rough estimate for the cost and schedule
The team is expected to capture the system requirements. They should also know the risk factors and should establish and validate the system architecture. The design is also created.
Traceability and cross-referencing
This helps see which part of the system needs to be tested
This helps to see the positives and negatives of the old system
This helps identify requirements that haven't been met
This helps identify future updates for the system
Scrum - Sprint
Is set over one day and is started whenever
Basic unit of work
Is an ordered list of what needs to be done
Can be various lengths and is started when the old sprint ends
Scrum Events
Daily start-ups
Reviews with the stakeholders
Writes up backlog
Sprint planning and reviews
What are user stories
An ordered list of requirements
Customer reviews of the software
Special product backlog systems that don't just describe a feature, they say how a feature behaves and what is happening for the user
Ordered list of all the items a team should work on with the highest priority item on the top of the list.
Product backlog
Ordered lists of all the items a team may work on with the highest priority item on the top. The product owner should maintain the backlog.
Special product backlog systems that don't just describe a feature, they say how a feature behaves and what is happening for the user.
The basic unit of work that can be any length
All the versions the software has had
Lean Principles
Eliminate waste, Amplifying learrning, Decide as late as possible, Deliver as slow as possible, Empower the team, build integrity in, optimise the whole
Eliminate waste, Amplifying learrning, Decide as early as possible, Deliver as slow as possible, Empower the team, build integrity in, optimise the whole
Eliminate waste, Amplifying learrning, Decide as early as possible, Deliver as fast as possible, Empower the team, build integrity in, optimise the whole
Eliminate waste, Amplifying learrning, Decide as late as possible, Deliver as fast as possible, Empower the team, build integrity in, optimise the whole
XP values
Respect, Cunning, Feedback, Communication, Simplicity
Respect, Courage, Feedback, Communication
Respect, Courage, Feedback, Communication, Simplicity
Respect, Courage, Feedback, Communication, Simplicity, Cunning
Spiral - Planning
Evaluation of the software by the customer. Also includes identifying and monitoring risks such as schedule slippage and cost overrun
Includes testing, coding and deploying the software at the customer site
Identification of potential risks are done while risk mitigation strategy is planned and finished
Estimating the cost, schedule and resources for the iteration. It also involves understanding the system requirements for continuous communication between the system analyst and the customer
Spiral - risk analysis
Evaluation of the software by the customer. Also includes identifying and monitoring risks such as schedule slippage and cost overrun
Estimating the cost, schedule and resources for the iteration. It also involves understanding the system requirements for continuous communication between the system analyst and the customer
Identification of potential risks are done while risk mitigation strategy is planned and finished
Includes testing, coding and deploying the software at the customer site
Spiral - Engineering
Includes testing, coding and deploying the software at the customer site
Estimating the cost, schedule and resources for the iteration. It also involves understanding the system requirements for continuous communication between the system analyst and the customer
Evaluation of the software by the customer. Also includes identifying and monitoring risks such as schedule slippage and cost overrun
Identification of potential risks are done while risk mitigation strategy is planned and finished
Spiral - Transition
Includes testing, coding and deploying the software at the customer site
Identification of potential risks are done while risk mitigation strategy is planned and finished
Evaluation of the software by the customer. Also includes identifying and monitoring risks such as schedule slippage and cost overrun
Estimating the cost, schedule and resources for the iteration. It also involves understanding the system requirements for continuous communication between the system analyst and the customer
V-Model - Verification phase
Coding the modules, code reviews and code optimisation happens. At the end the code is put in the repository
The testing phase. This includes user testing, integration testing, system testing and acceptance testing
Estimating the cost, schedule and resources for the iteration. It also involves understanding the system requirements for continuous communication between the system analyst and the customer
Includes the requirements analysis, and the design. System design, architectural design and module design all fall under this stage
V-model - Coding phase
The testing phase. This includes user testing, integration testing, system testing and acceptance testing
Estimating the cost, schedule and resources for the iteration. It also involves understanding the system requirements for continuous communication between the system analyst and the customer
Coding the modules, code reviews and code optimisation happens. At the end the code is put in the repository
Includes the requirements analysis, and the design. System design, architectural design and module design all fall under this stage
V-model - validation phase
Includes the requirements analysis, and the design. System design, architectural design and module design all fall under this stage
Estimating the cost, schedule and resources for the iteration. It also involves understanding the system requirements for continuous communication between the system analyst and the customer
The testing phase. This includes user testing, integration testing, system testing and acceptance testing
Coding the modules, code reviews and code optimisation happens. At the end the code is put in the repository
Kanban values
Transparency, Balance, Collaboration, Customer focus, Flow, Leadership, Understanding, Agreement, Respect
Transparency, Balance, Collaboration, Customer focus, Flow, Leadership, Feedback, Agreement, Respect
Respect, Courage, Feedback, Communication, Simplicity
Eliminating waste, Amplifying learning, Decide as late as possible, Deliver as fast as possible, Empower the team, Build integrity in, Optimise the whole
Role of the Scrum master
Responsible for improving interactions in order to maximise productivity, arranges and facilitates start-ups, clears obstacles and protects the team from distractions
The voice of the customer, determines what the team works on based on priority, stake holders communicate with the product owner
Responsible for realising the stories identified by the customer.
Commits to finishing sprints and are flexible in what they can contribute Sprint goals are the most important and all team members should be able to perform the task
Role of the Product Owner
The voice of the customer, determines what the team works on based on priority, stake holders communicate with the product owner
Commits to finishing sprints and are flexible in what they can contribute Sprint goals are the most important and all team members should be able to perform the task
Responsible for realising the stories identified by the customer.
Responsible for improving interactions in order to maximise productivity, arranges and facilitates start-ups, clears obstacles and protects the team from distractions
role of the SCRUM development team
Responsible for realising the stories identified by the customer.
The voice of the customer, determines what the team works on based on priority, stake holders communicate with the product owner
Responsible for improving interactions in order to maximise productivity, arranges and facilitates start-ups, clears obstacles and protects the team from distractions
Commits to finishing sprints and are flexible in what they can contribute Sprint goals are the most important and all team members should be able to perform the task
Role of the Tracker
Responsible for improving interactions in order to maximise productivity, arranges and facilitates start-ups, clears obstacles and protects the team from distractions
Responsible for realising the stories identified by the customer.
Help the team by trying to avoid making previously made mistakes
This keeps track of relevant metrics and also identifies areas for improvements
Role of the XP developer
Help the team by trying to avoid making previously made mistakes
Responsible for realising the stories identified by the customer.
This keeps track of relevant metrics and also identifies areas for improvements
Commits to finishing sprints and are flexible in what they can contribute Sprint goals are the most important and all team members should be able to perform the task
Role of the Coach
This keeps track of relevant metrics and also identifies areas for improvements
Help the team by trying to avoid making previously made mistakes
The voice of the customer, determines what the team works on based on priority, stake holders communicate with the product owner
Responsible for realising the stories identified by the customer.
Role of the Sponsor
They monitor the project from a business standpoint and let the higher ups know about progress
Define and refine features often in conjunction with a technical lead. They also organise the requirements
Will use the system in their work. They will define requirements, review specifications, work with the developers to introduce the system, conduct acceptance tests
Leads and motivates the team. They track the development progress and are the link between the development team and the customer
Role of the Customer
Leads and motivates the team. They track the development progress and are the link between the development team and the customer
They monitor the project from a business standpoint and let the higher ups know about progress
Will use the system in their work. They will define requirements, review specifications, work with the developers to introduce the system, conduct acceptance tests
Define and refine features often in conjunction with a technical lead. They also organise the requirements
Role of the Project Manager
They monitor the project from a business standpoint and let the higher ups know about progress
The person who will use the system in their work. They will define requirements, review specifications, work with the developers to introduce the system, conduct acceptance tests
Leads and motivates the team. They also track the development progress and are the link between the development team and the customer
Define and refine features often in conjunction with a technical lead. They also organise the requirements
Role of the Business Analyst
The person who will use the system in their work. They will define requirements, review specifications, work with the developers to introduce the system, conduct acceptance tests
Leads and motivates the team. They also track the development progress and are the link between the development team and the customer
Define and refine features often in conjunction with a technical lead. They also organise the requirements
They monitor the project from a business standpoint and let the higher ups know about progress
Role of the System Analyst
Analyses and plans the flow of data in a system and also looks at existing solutions. They write the technical requirements of the system and talk to the designers about ideas
Designs solutions to solve business problems based upon the requirements specification provided. This includes software design, database design and the UI design
Creates code and does the initial testing. They work closely with the analysts and the designers
Responsible for creating test plans doing black/white box testing and documenting test results that inform developers of bugs to fix
Role of the Designer
Creates code and does the initial testing. They work closely with the analysts and the designers
Designs solutions to solve business problems based upon the requirements specification provided. This includes software design, database design and the UI design
Analyses and plans the flow of data in a system and also looks at existing solutions. They write the technical requirements of the system and talk to the designers about ideas
Responsible for creating test plans doing black/white box testing and documenting test results that inform developers of bugs to fix
Developers
Designs solutions to solve business problems based upon the requirements specification provided. This includes software design, database design and the UI design
Analyses and plans the flow of data in a system and also looks at existing solutions. They write the technical requirements of the system and talk to the designers about ideas
Creates code and does the initial testing. They work closely with the analysts and the designers
Responsible for creating test plans doing black/white box testing and documenting test results that inform developers of bugs to fix
Testers
Analyses and plans the flow of data in a system and also looks at existing solutions. They write the technical requirements of the system and talk to the designers about ideas
Responsible for creating test plans doing black/white box testing and documenting test results that inform developers of bugs to fix
Designs solutions to solve business problems based upon the requirements specification provided. This includes software design, database design and the UI design
Creates code and does the initial testing. They work closely with the analysts and the designers
Role of the technical Architect
Designs solutions to solve business problems based upon the requirements specification provided. This includes software design, database design and the UI design
Defines the structure of a program of system. They can act as Project Manager, overseeing IT assignments that are aimed at improving the business and ensuring all parts of the project runs
Analyses and plans the flow of data in a system and also looks at existing solutions. They write the technical requirements of the system and talk to the designers about ideas
Has knowledge in a domain other than software development. They are often asked to review, improve and approve technical work
Role of the domain expert
Creates code and does the initial testing. They work closely with the analysts and the designers
Designs solutions to solve business problems based upon the requirements specification provided. This includes software design, database design and the UI design
Defines the structure of a program of system. They can act as Project Manager, overseeing IT assignments that are aimed at improving the business and ensuring all parts of the project runs
Has knowledge in a domain other than software development. They are often asked to review, improve and approve technical work
What is black box testing
The tester can see the code. They are aware of what the code should do and how it is done
The tester cannot see the code. They are aware of what the code should do but not how it is done
What is Unit testing
Tests coexistence and communication between modules
Tests individual modules for bugs
Checks the systems functionality and communication with other systems
Tests in the user environment where it can uncover compatibility issues and check non-functioning requirements
What is Integration testing
Tests in the user environment where it can uncover compatibility issues and check non-functioning requirements
Checks the systems functionality and communication with other systems
Tests individual modules for bugs
Tests coexistence and communication between modules
What is System testing
Tests individual modules for bugs
Checks the systems functionality and communication with other systems
Tests coexistence and communication between modules
Tests in the user environment where it can uncover compatibility issues and check non-functioning requirements
What is acceptance testing
Tests individual modules for bugs
Tests coexistence and communication between modules
Tests in the user environment where it can uncover compatibility issues and check non-functioning requirements
Checks the systems functionality and communication with other systems
Which stage of the SDLC would include the following activities: • Consideration of the potential risks involved in developing software. • Determining whether the project outcome will be worth the costs involved.
Implementation / Deployment
Requirements Analysis.
Testing
Feasibility Study
Which of the following is a purpose of the SDLC
To provide a suitable framework for planning a software development project
To provide a set of steps to create a software end-product
To create a methodology for developing software code
To provide a consistent set of coding standards
Which sequence puts the following stages in the SDLC in the CORRECT chronological order?
a) Testing. b) Requirements Analysis. c) Maintenance. d) Design
b, d, a, c.
b, d, c, a
d, b, a, c
d, b, c, a
Which of the following is NOT an iterative methodology?
Waterfall
UP / RUP
Scrum
Spiral
Which software development method allows software to be deployed for client use after each iteration?
Agile.
Unified Process (UP).
V-Model
Waterfall
Which of the following is a role of a domain expert?
To provide insight into business products and processes.
To specify functional requirements on behalf of the customer.
To identify non-functional requirements
To assess project risks and constraints
A software application used by the general public has been found to have a security weakness. The problem has been diagnosed and a development project initiated to correct the security weakness. The project team will include security domain experts. At which stages in the development will it be the MOST important to involve the domain experts?
Feasibility study, code development
Requirements analysis, maintenance.
Design, testing.
Initiation, implementation / deployment
During the design stage of the SDLC, which of the following would be developed?
Software specification
Software code.
Use cases.
Test plans.
Which of the following is a purpose of applying traceability and cross-referencing between software development deliverables?
To assist in tracking project management issues
To ensure that deliverables are delivered in priority sequence
To determine which deliverables might be affected by a change request.
To identify requirements which have not been met
Interaction diagrams are a deliverable of which stage of the SDLC?
Analysis
Design.
Implementation (Deployment)
Code Development
Which of the following factors would be a potential candidate reason for choosing an Agile method for a software development project?
The development project consists of a large distributed team
The customer has very few formally documented requirements
There are strict safety critical requirements.
The customer has a range of complicated contractual commitments that are linked to the planned development.
Which of the following would be responsibilities of the product owner in a software development project using an agile method of scrum?
Prioritising items on the backlog.
Accepting stories as done.
Managing the execution stage of the project
Representing the customer to the Agile team
A company is developing application software for use by the general public using the Scrum Methodology. Which of the following will NOT be a responsibility of the Scrum Master?
Help the development team to achieve their goals.
Remove impediments from the team
Shield the team from interruptions during the sprint
Lead the development team
Which of the following are objectives of the maintenance stage of the SDLC?
Identify and fix bugs before software is implemented (deployed) so that they do not cause operational failures.
Adapt and modify the software as users’ needs change through time after implementation (deployment).
Complete any testing that could not be finished before implementation (deployment).
Fix bugs identified during live operation of the software.
Which of the following is a TRUE statement about the software development lifecycle (SDLC)?
The SDLC should be used only with sequential development methodologies
The SDLC contains detailed instructions that should be followed to develop any IT system.
The SDLC can be used to solve any business problem.
The SDLC is independent of the software development methodology used.
Which statement describes the use of the V-Model software development method in the software development lifecycle (SDLC
All seven stages of SDLC are performed for each iteration, with verification and validation performed in the final stage
Each of the seven stages are performed iteratively before moving onto the next stage with verification and validation performed in the testing stage.
The first three stages are performed once then verified and validated. The following four stages are iterative.
Each stage of the SDLC has a corresponding verification and validation stage.
A software development project is being initiated, and the project manager has set the following broad objectives for the software development team:
Focus on the customers. • Energise the team. • Eliminate waste. • Learn quickly. • Keep improving. Which of the following methodologies has a focus on eliminating waste?
Lean.
Unified Process (UP).
Scrum
XP
A user guidance document has been developed alongside the development of software, to assist the users in operating and using the software. The introduction includes a ‘Change history’ table. Which of the following are provided by this change history table?
An audit trail of the reasons for change.
Traceability of the source of changes.
Keeping track of the details of the change
Providing information for stakeholders.
Which of the following statements is CORRECT?
Software development teams must adopt a project structure in order to ensure that software is delivered to time, quality and cost.
Software development teams using waterfall methods of development should adopt a functional structure reporting to a software development manager.
Software development teams using agile methods should adopt a matrix structure that allows for complete flexibility of roles across the team
Software development teams should adopt a structure that is appropriate for their organisation, irrespective of whether project working is used.
A software development project has encountered a problem. The code development is taking longer than planned and has failed to reach a key milestone. The code developers are blaming the designers, saying that the design is too difficult and it is not possible to get the code working in the time allowed for code development. The designers are blaming the project planners, saying that the plan did not take proper account of the likely complexity of the design. The planners have said that the code developers are at fault as they do not have the skills needed to get the code developed in the timescale required. Where does the responsibility lie for resolving the problem?
The project planners
The software designers
The project manager
The software code development manager