WorksheetsQuiz 2 - Material Master, BOM, Work Center
Total questions: 10
Worksheet time: 80secs
__ is a complete, formally structured list of the components of a product or assembly. It contains the description of each component, the quantity, and unit of measure.
BOMB
BOM
Bill of Master
Bill of Lading
Is defined as a recipe of several products with a large proportion of identical components or parts.
Structure BOM
Variant Material
Variant BOM
Variant Structure
Work center is where production activities are being executed.
True
False
An organizational unit allowing differentiation between the different stocks of a material in a plant.
Location
Work Center
Storage Location
Inventory
___ can be machines, people, production lines or groups of craftsmen.
Work Location
Work Center
Center
Work Storage Location
Transaction code to display Bill of Materials.
CS02
CS03
CS01
CS04
___ can be used for identifying a product, purchase material, goods issue or good receipt, MRP and production confirmation.
Master Data
Material Master
Data Master
Material Type
Transaction code to display work center.
CR01
CR03
CA02
CA03
___ determines certain attributes of the material and has important control functions.
Material Type
Master Data
Material Master
Record
What are the commonly used standard material types in SAP PP? Select all that applies.
HALB (semi-finished goods)
ROH (raw materials)
VERP (packaging)
FERT (finished goods)
