OFWP How to Plan & Schedule, MTL, Leave Management

Total questions: 15

Worksheet time: 8mins

Name
Class
Date
1.

What is the purpose of having L3 Leave Management Procedure?

a)

To facilitate continuous safe and efficient operation during normal and off hours.

b)

To save money on manpower.

c)

To encourage staff to apply leave.

d)

To encourage Head of Operation to reject leave application.

2.

How many types of leave stipulated in L3 Leave Management Procedure?

a)

4 types

b)

All leaves are the same

c)

3 types

d)

5 types

3.

How many minimum days requirement for an Operation staff to apply his Annual Leave?

a)

1 year before his AL

b)

2 days before his AL

c)

3 days before his AL

d)

No minimum days

4.

How many minimum days requirement for an Operation staff to apply his Medical Leave (ML)?

a)

5 hours before working hours

b)

2 hours before working hours

c)

24 hours before working hours

d)

4 hours before working hours

5.

For an OTF, to whom he should notify his application of Annual Leave, Emergency Leave & Medical Leave?

a)

HSE Executive

b)

All friends and colleagues

c)

Admin Executive

d)

AC, SAC, SPSFP

6.

Who is the owner of MTL?

a)

Head of Operation

b)

AC

c)

SAC

d)

SPSFP

7.

Below statements are INCORRECT about VAT Screening except (More than 1 selection)

a)

Is a mechanism to evaluate all tasks associated to the safe and efficient normal plant operation

b)

To be conducted if there are changes in requirement leading to addition or removal of tasks identified in MTL

c)

To ensure manpower planning is performed only by SPSFP.

d)

VAT screening is to be conducted by Head of Operation

8.

Which below statement is CORRECT about MTL?

a)

MTL is owned by AC & SAC to ease Operation Tasks Planning

b)

MTL to be reviewed on annual or periodic basis, align to the specific plant goals.

c)

MTL is flexible to be amended by all Operation Executives

d)

MTL has certain number of limits depending on OFWP policy

9.

All below is the VAT criterias EXCEPT?

a)

HSSE & sustainability

b)

People & Organization

c)

Low Cost to Serve

d)

Duration of executing task

10.

During MTL Development process, there are 5 stages involved. At which stage the MTL Approval takes place?

a)

Stage D

b)

Stage E

c)

Stage C

d)

Stage F

11.

Choose the frequency of MTL review process (more than one selection)

a)

Annually

b)

2 Yearly

c)

6 Monthly

d)

As when needed upon any changes/requirement to the current business goal

12.

Who is responsible to develop all procedure and checklist in POINT.

a)

ACGK

b)

TA

c)

OTF

d)

MAC

13.

AC/GK shall ONLY approve the eTask if the task complies with the Value Assessment of Task, otherwise AC/GK shall reject the eTask

a)

TRUE

b)

FALSE

14.

What factor shall be consider by ACGK during planning of operational task

a)

Task that require external services

b)

Task that require material / tool.

c)

Task that require procedure/guideline.

d)

Task that require specific capability.

15.

Choose the correct responsibility of Work Originator

i. Ensure MTL is reviewed annually

ii. To fill up VAT and liaise with AC/GK for screening and evaluation of VAT

iii. Ensure value added eTask is created in POINT 3.0+

iv. Assign eTask to OTF on daily basis

a)

ii & iii

b)

i only

c)

iii & iv

d)

All of above