Total questions: 12
Worksheet time: 14mins
Who is required to designate a WESM Compliance Officer?
Each WESM Member
The Market Operator and the System Operator
The Metering Service Provider
Any WESM Service Providers
All of the above
Which of the following statements relating to PEMC-IEMOP transition is not correct?
IEMOP is a non-stock, non-profit organization
Any rules change proposal in the WESM Rules shall be deliberated by a Rules Change Committee, a governance committee under IEMOP
Settlement of transactions in the WESM is the responsibility of IEMOP.
None of above
Dispatch tolerances are set to allow limits on the extent to which generators may deviate from the dispatch targets. The current tolerance limit is:
+/- 3% of the dispatch target or loading level
+/- 1.5% of the dispatch target or loading level
+1.5% or -3% of the dispatch target or +/-1MW, whichever is higher
-1.5% or +3% of the dispatch target or +/-1MW, whichever is higher
ABC Plant, a scheduled generating unit, was scheduled to run at 20MW for interval 9 but it was able to generate 19.1MW only at the end of hour, with a resulting deviation of 0.9MW or -4.5% of the dispatch target. There are no other reasons provided by ABC during the assessment. ABC Plant is in breach of the RTD Schedule.
True
False
A form that is transmitted to the trading participants who are initially flagged for possible non-compliance with the Must-Offer Rule and Real-Time Dispatch Schedules.
Significant Event Report Form
Significant Event Notice
Daily Compliance Notice
Dispatch Deviation Report Form
XYZ Plant is a must-dispatch generating unit. It submitted its projected output for interval 12. At the end of interval 12, its actual dispatch differs from its projected output and schedule. Which of the following is true?
If deviation is beyond the tolerance limit, it will be flagged as probable breach
It shall report the cause/s of deviation to the DOE
The System Operator shall allow the XYZ Plant to generate at its maximum available output
None of the above is correct.
For Forecast Accuracy Standards: the mean absolute percentage error (MAPE) and percentile 95 of the forecasting error (Perc95) are set as follows:
1) MAPE for Solar, Wind and Run of River Hydro: <18%
2) Perc95 for Solar, Wind and Run of River Hydro: <30%
Only 1 is correct
Only 2 is correct
1 and 2 are correct
1 and 2 are wrong
Under the WESM Rules,
I. The __________________________________ shall ensure that the metering installations are tested and calibrated in accordance the Grid Code and Distribution Code.
II. The ___________________________________ shall ensure that the accuracy of metering installations complies with the requirements of the Grid Code and Distribution Code.
(I) Metering Service Provider; (II) Department of Energy
(I) Metering Service Provider; (II) Metering Service Provider
(I) Department of Energy; (II) Metering Service Provider
(I) Department of Energy; (II) Energy Regulatory Commission
Which of the following statements about reserves is not correct?
Only trading Participants with ERC-Approved ASPA shall submit reserve offers for the market projections in the WESM
The Trading Participants with approved contingency reserve schedule for the next day shall submit a reserve offer equal to one-half (1/2) of their day-ahead ancillary schedule (DAAS)
All reserve transactions shall be settled based on their Ancillary Service Procurement Agreement (ASPA).
None of the above
Trading Participants shall immediately advise the System Operator and Market Operator of any circumstance which threaten a significant probability of material adverse change in the state of their facilities in any trading interval of any trading day in the current week-ahead market horizon. Which report is required to be submitted by the Trading Participants after the occurrence of the said event?
Significant Event Notice
Significant Event Report Form
Dispatch Deviation Report Form
Non-Compliance Report Form
ABC Plant, a run-of-river hydro classified and registered as must dispatch generating unit in the WESM, was scheduled to run at 20MW for interval 9 but it was able to generate 18.9MW only at the end of hour, with a resulting deviation of 1.1MW or -5.5% of the dispatch target. There are no other reasons provided by ABC during the assessment. ABC Plant is in breach of the RTD Schedule.
True
False
Which of the following statements is incorrect? The WCO –
shall ensure compliance of their respective organization with WESM Rules
may propose policies or amendments to the WESM Rules
shall serve as the main contact person, for compliance-related matters
shall submit a quarterly compliance report.
none of the above.