WorksheetsConstruction Safety_2
Total questions: 10
Worksheet time: 3mins
Safety is the responsibility of every employee. But who is ultimately responsible for the implementation of safety requirements?
Safety Manager
Project Manager
Line management
Senior Management
Which of the following are considered as Safety Trainings?
Safety Orientation
Work at Height
Daily Toolbox Talk
First Aid Training
All of the above
In BASF projects, what is the moral and legal requirement contractor need to follow?
PTW (Permit to Work)
PPE
Disciplinary Action
What is the time limit to report Incidents which don’t fall under category of Rapid Incident Reporting?
12 Hours
48 Hours
24 Hours
8 Hours
What is the rating and action time of the electric current of the leakage protection / grounding device?
Must be < 30mA and action time must be > 0.1s
Shall not be > 30mA and the action time must be < 0.1s
Shall not be < 63mA and the action time > 0.1 s
What should be the minimum height of overhead temporary power cables?
Shall not be installed lower than 2.5 M
Shall not be installed more than 2.5 M
Shall be installed below 1.8 M
To be routed 4.5 M and above
Who should conduct Last Minute Risk Assessment?
Permit Approver
Permit Issuer
Task Supervisor
All above
What is the special condition for closing hot work permit?
To close 30 minutes after actual completion of work
No need to close the permit
To close 5 minutes after work completion
Which procedure to be followed for any start-up, repairing or maintenance of machineries or equipment?
Lock out, Tag out, Try Out (LOTOTO)
Log Out Try Out (LOTO)
Look Out Tag Out, Try Out (LOTOTO)
Which are Leading Indicators for Construction Safety
Near Miss Cases
Field Safety Observations
Safety Trainings
Inspection of PTW
All Above