Construction Safety_2

Total questions: 10

Worksheet time: 3mins

Name
Class
Date
1.

Safety is the responsibility of every employee. But who is ultimately responsible for the implementation of safety requirements?

a)

Safety Manager

b)

Project Manager

c)

Line management

d)

Senior Management

2.

Which of the following are considered as Safety Trainings?

a)

Safety Orientation

b)

Work at Height

c)

Daily Toolbox Talk

d)

First Aid Training

e)

All of the above

3.

In BASF projects, what is the moral and legal requirement contractor need to follow?

a)

PTW (Permit to Work)

b)

PPE

c)

Disciplinary Action

4.

What is the time limit to report Incidents which don’t fall under category of Rapid Incident Reporting?

a)

12 Hours

b)

48 Hours

c)

24 Hours

d)

8 Hours

5.

What is the rating and action time of the electric current of the leakage protection / grounding device?

a)

Must be < 30mA and action time must be > 0.1s

b)

Shall not be > 30mA and the action time must be < 0.1s

c)

Shall not be < 63mA and the action time > 0.1 s

6.

What should be the minimum height of overhead temporary power cables?

a)

Shall not be installed lower than 2.5 M

b)

Shall not be installed more than 2.5 M

c)

Shall be installed below 1.8 M

d)

To be routed 4.5 M and above

7.

Who should conduct Last Minute Risk Assessment?

a)

Permit Approver

b)

Permit Issuer

c)

Task Supervisor

d)

All above

8.

What is the special condition for closing hot work permit?

a)

To close 30 minutes after actual completion of work

b)

No need to close the permit

c)

To close 5 minutes after work completion

9.

Which procedure to be followed for any start-up, repairing or maintenance of machineries or equipment?

a)

Lock out, Tag out, Try Out (LOTOTO)

b)

Log Out Try Out (LOTO)

c)

Look Out Tag Out, Try Out (LOTOTO)

10.

Which are Leading Indicators for Construction Safety

a)

Near Miss Cases

b)

Field Safety Observations

c)

Safety Trainings

d)

Inspection of PTW

e)

All Above