Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

CPM

Total questions: 17

Worksheet time: 3mins

Name
Class
Date
1.

What is CPM?

a)

critical process method

b)

critical path activity

c)

Critical path method

d)

critical process activity

2.

What is an event?

a)

start or end of an event

b)

start of an activity

c)

end of an activity

d)

start and end of an activity

3.

In network of CPM logical sequence is important.

a)

True

b)

False

c)

May be

d)

All of above

4.

In network diagram, activities can have _____ arrow/s

a)

1

b)

More than 1

c)

0

d)

2

5.

A network can have ___ initial events and ___ final events.

a)

1,more than 1

b)

more than 1,1

c)

more than 1, more than 1

d)

1,1

6.

The total time required for the completion of the given project is called as

a)

Total completion time

b)

Earliest start time

c)

Latest start time

d)

Latest finish time

7.

In the given figure activity D starts at

a)

latest start time

b)

Earliest start time

c)

earliest finish time

d)

latest finish time

8.

Critical path in network gives

a)

Critical time

b)

Longest time

c)

Shortest time

d)

Production time

9.

A step-by-step conversion of raw material into finished usable product is called as

a)

Production

b)

Productivity

c)

Quality control

d)

Inspection

10.

____________ is a group of several units joint together to achieve a common goal

a)

Quality Assurance

b)

Production

c)

Production system

d)

Inspection

11.

_________ is the broad range of activities required to plan, control and execute a product's flow from material to production for distribution in the most economical way possible.

a)

Production

b)

Quality management

c)

Production system

d)

Supply chain management

12.

A detailed study of part drawings for the manufacturing of the part is called as ___________

a)

Part Print Analysis

b)

Assembly drawing

c)

Plant Layout

d)

Process planning

13.

What is NOT included in part print analysis?

a)

General part description

b)

Material

c)

Design modification

d)

Overall manufacturing time

14.

Which is the First step in planning of process from raw material to finished product

a)

Make or buy decision

b)

Inspection

c)

Part print analyses

d)

Combine the operation

15.

Out of following which is NOT factors affecting process planning

a)

Production methods

b)

Process capability

c)

Surface finish

d)

Inspection

16.

Operation sheet is

a)

process flow diagram

b)

assembly diagram

c)

diagram

d)

in tabular form

17.

Line balancing is

a)

balancing of production line

b)

flow sheet

c)

management of production system

d)

balancing inspection process