WorksheetsShip's Surveys
Total questions: 10
Worksheet time: 4mins
Held before the ship is put in service and the appropriate certificate is issued for the first time.
Initial Survey
Periodical Survey
Intermediate Survey
Annual Survey
Alleviate means
to assist
to lessen
to improve
to deviate
Inspection of specified items relevant to the particular certificate.
Intermediate Survey
Periodical Survey
Renewal Survey
Annual Survey
Same as a periodical survey but also leads to the issue of a new certificate.
Periodical Survey
Annual Survey
Renewal Survey
Intermediate Survey
General inspection of the items relating to the particular certificate to ensure that they have been maintained and remain satisfactory
Periodical Survey
Initial Survey
Annual Survey
Additional Survey
Inspection made after a repair resulting from investigations or whenever any important repairs or renewals are made.
Annual Survey
Initial Survey
Intermediate Survey
Additional Survey
Inspection of the outside of the ship’s bottom should be
carried out with the ship in dry dock for ships _____.
15 years of age and over
less than 15 years of age
Ships not yet in service
Ships that are already converted
The periodical survey, in case of cargo ship safety
equipment certificate as required by the relevant regulations should be held:
within three months before or after the fourth anniversary date
within three months before or after the second anniversary date
within three months before or after the fifth anniversary date
within three months before or after the first anniversary date
SOLAS Chapter II-2
Safety Measures to Enhance Maritime Safety
Construction-Subdivision and Stability,
Machinery
Life-saving Appliances and Arrangements
Fire Protection, Fire Detection and Fire
Extinction
SOLAS Chapter III
Carriage of Dangerous Goods
Radio communications
Life-saving Appliances and Arrangements
Carriage of Cargoes
