Architectural design detailing

Total questions: 40

Worksheet time: 27mins

Name
Class
Date
1.

Which of the following is a use of grid layout in a setting out plan?

a)

Marking of column in the site

b)

For creating reference for various features in site

c)

For creating reference between building boundary and site boundary

d)

All of the above

2.

Which of the following is the most important information in a column layout

a)

Column size and reference to the corresponding grid

b)

Column orientation

c)

Column naming

d)

All of the above

3.

Which of the following is a structural drawing required for construction

a)

Working drawing for different floors

b)

Beam layout and slab drawing

c)

Handrail detail

d)

Wall elevations

4.

What is the main purpose of a working drawing

a)

Dissemination of information and means of communication of construction details

b)

Form generation

c)

Spatial planning

d)

All of the above

5.

What is the purpose of a missing step

a)

No particular purpose

b)

Ensure proper turning of handrail in the mid landing

c)

So that people don’t trip

d)

Structural purpose

6.

What is the purpose of a returnable air grill

a)

Aesthetic purpose

b)

For circulation of air back to AHU

c)

To create pressure

d)

All of the above

7.

Which are the following down pipes required for drainage from toilets to the manhole

a)

Soil pipe and waste water pipe

b)

Hot water pipe

c)

Floor trap

d)

Supply pipe

8.

Which of the following drawing is required to correlate various services running along the ceiling of a space

a)

HVAC layout

b)

Beam layout

c)

Coordinated reflected ceiling plan

d)

Sprinkler layout

9.

What is the purpose of Manhole in plumbing lines

a)

To change direction of pipes

b)

To help in inspection and cleaning

c)

To lay sewer line in conventional lengths

d)

All of the above

10.

In a project where there is a requirement of provision of transformer which is considered to be an apt location

a)

Near any site boundary

b)

Near the rear side of the site so that it is hidden from view

c)

Near the side of the site abutting any of the access road

d)

Very close to building

11.

What is the use of sub frame while constructing built in kitchen storage

a)

To counter the undulation in the wall surface

b)

Easier attachment between wall and storage

c)

To create level face in the front of the storage

d)

All of the above

12.

While laying wall tile in a toilet where should the starting tile be located

a)

Any top corner of tile layout

b)

Any bottom corner of the tile layout

c)

Middle of the tile layout

d)

Right bottom corner of the tile layout

13.

Where should the primary light switch for a room should be located

a)

Near the entrance door of the room

b)

Rear side of the room

c)

Near the window of the room

d)

None of the above

14.

What information is provided in door and window schedule

a)

Nomenclature for doors and windows based on type and dimensions

b)

Frame width

c)

Shutter height

d)

Location of windows

15.

Which of the following is the crucial information required in a working drawing

a)

Dimension of masonry

b)

Location of opening for doors and windows

c)

Various levels within the floor

d)

All of the above

16.

Which of the following one of the details that should be shown in a site sewerage plan

a)

Location of manholes and gully trap

b)

Flooring material

c)

Water supply sump

d)

All of the above

17.

What is the ideal height of kitchen counter

a)

900mm

b)

0.7 m

c)

75 cm

d)

1200 mm

18.

At what height can the toilet wall tiling be ideally terminated

a)

2100 mm from the floor level

b)

1500 mm from floor level

c)

There is no ideal height

d)

1200 mm from floor level

19.

Where is a threshold used in flooring

a)

When there is a change in flooring material between 2 rooms

b)

Level difference

c)

Between attached toilet and the room flooring

d)

All of the above

20.

Ideally where should the indoor AC unit in a bedroom be located

a)

At the centre of the longer side of the room

b)

At the centre of the shorter side of the room

c)

On top of the window

d)

It can be placed anywhere

21.

What is large ducts at start of the ducting layout connected to AHU called

4 lines
22.

What does abbreviation FFl stands for ?

4 lines
23.

Generally how are columns named in column layout

4 lines
24.

Name any 2 drawings which Architect needs to coordinate with the structural engineer?

4 lines
25.

What is the primary material used to construct storage units in a kitchen

4 lines
26.

Where does the electrical shaft terminate in the ground floor

4 lines
27.

Generally what is the thickness between RCC slab and floor finish ?

4 lines
28.

Give an example of a door schedule?

4 lines
29.

Where can you find a waist slab in a building

4 lines
30.

What is the use of a 2 way switch

4 lines
31.

How should the horizontal and vertical grid in a centreline be named and elaborate on why they should be named in that particular way?

4 lines
32.

Elaborate the sequence of procedure and process involved in designing to execution of a project

4 lines
33.

Broadly list out the construction drawings which need to be generated by an Architect

4 lines
34.

What is the important information that needs to be provided in a working drawing section

4 lines
35.

What is the purpose of supply and return air grill

4 lines
36.

What is the difference between a manhole and gully trap?

4 lines
37.

List out the important uses of working drawings of a floor plan

4 lines
38.

List out the advantages of a concealed beam

4 lines
39.

List down the critical things to be considered while doing a staircase drawing

4 lines
40.

What are the various service shafts required in an apartment building?

4 lines