The activity which is crashed first has
Highest cost slope
Least cost slope
Crashing has no relation with cost slope
None of these
A contract enforceable by law at the opinion of one of the parties but not at the opinion of other is
Void contract
Voidable contract
illegal contract
Implied contract
Which of the following is correct
Indirect cost increases with increase in time
Indirect cost decreases with increase in time
First increases then decreases
Depends upon situations
The reduction in project time normally results in
Decreasing the direct cost and increasing the indirect cost
Increasing the direct cost and decreasing the indirect cost
Increasing the direct cost and indirect cost both
Decreasing the direct cost and indirect cost both
Consider the following statements
In the bar chart planning
1) interdependence of the operations cannot be portrayed
2) progress of work can be measured
3)spare time of the activities can be determined
4) schedule cannot be updated
Of these statements, which of the following are correct
1,2 and 3
1 and 4
2,3, and 4
1 ,2 and 4
Site order book is used for recording
Instructions of the executive Engineer
Construction measurements
Requisition of plants and equipments
Indents for materials to be ordered
The system of organisation introducing by F W Taylor is called
Effective organisation
Functional organisation
Line and staff organisation
Line organisation
Match list 1 with list 2 and select the correct answer using the codes given below the lists
List 1
(Activity types).
A) critical activity to be crashed first to reduce.
B) critical activity
C)dummy activity
D) subcritical activity
List 2
1)it has float
2) it has least cost slope
3) it maintenance logic of network
4) it has no float
A-1 ,. B-2 , C- 4, D-3
A-3 , B-1 , C-2, D-4
A-2, B- 4, C- 3, D-1
A-4, B-3 ,C-1, D- 2
Consider the following statements
CPM network helps an engineer to
1)Concentrate his attention on critical activities
2)Divert the resources from non critical advanced activities to critical activities
3)be cautious in avoiding any delay in the critical activities in order to avoid delay of the whole project
Of these statements, which of these are correct
1 and 2
2 and 3
1 and 3
1,2 and 3
Match list 1 with list 2 and select the correct answer using the codes given below the lists
List 1
A)used for recording instructions given by the executive Engineer at site
B) used widely for civil engineering construction
C) one of the principles of the organisation
D) one of the functions of management
List 2
1) coordination
2)unity of command
3)line of organisation
4) site order book
A-4 , B-3, C-2,. D-1
A-4, B-2, C-3, D-1
A-2, B-4, C-1, D-3
A-4 ,B-1, C-2, D-3
Consider the following statements
Resource levelling means
1) economic and utilisation of resources
2) gradual increase in resources
3) adjustment of resources to have the least variations
4)complete revamping of a resources to suit the requirements
5) validating network depending on resource constraints
of these statements which of the following are correct
1 and 2
2,3 and 4
3 and 5
All are correct
Match list one with the least two and select the correct answer using the codes given below the listes
List one
A) translate policy into a method of achieving the objectives set out
B)consist of defining the responsibilities of employees
C) transmits all the information to the supervising staff
D) the organisational setup is needed to operate efficiently with flow of information decision and results in all directions
List2
1)Coordinating
2) planning
3) organising
4)directing
A-3, B-2, C-1,D-4
A-2, B-3, C-1, D-1
A-3, B-2, C-4, D-1
A-2, B-3, C-4, D-1
Consider the following statements
In PERT
1) Takes care of uncertainties in the completion time
2) Requires single time estimate
3) is useful for research and development oriented problems
3)uses beta distribution probability curve
off these statements which of the following are correct
1 and 2
1,3 and 4
3 and 4
1,2,3 and 4
In resource levelling
Total duration of project is reduced
Total duration of project is increased
Uniform demand of resources is achieved
Cost of project is controlled
Match list 1 with list two and select the correct answer using the codes given below
List one( description of activity floats)
A ) earliest start time of its successor activity minus earliest finish time of the activity in question minus the duration
B)Time available for an activity performance minus duration of the activity
C)excess of minimum available time over the required activity duration D)difference between total float and free float of an activity
List2
1) Total float
2)free float
3) interfering float
4) independent float
A-1, B-2 ,C-3 D-4
A-1, B-2, C-4, D-3
A-2, B-1 , C-3, D-4
A-2, B-1 C-4,D-3
Party fails to do everything that is mentioned in contract is called
Material breach
Minor breach
Anticipating breach
Actual breach
Terms are not expressed in words is called
Express contract
Void contract
Implied contract
Voidable contract
In CPM the cost slope is determined by
Crash cost/ normal cost
Crash cost - normal cost /normal time - crash time
Normal cost /crash cost
Normal time - crash time/ crash cost - normal cost
A bar chart is drawn for
Time versus activity
Activity versus resources
Resources versus progress
Progress versus time
For a project critical path corresponds to
Longest path
Shortest path
Medium path
None of these
For completion of a project the critical part of the network represents
Maximum time
Minimum time
Medium time
Zero float
Most advisable method of dispute resolution
Mediation
Negotiation
Arbitration
Litigation
Which is the basic for preparing all types of schedule
Labour schedule
Material schedule
Construction schedule
Control schedule
Which represent the time at which an event is expected to occur
Earliest expected time
Expected time
Earliest start time
Latest start time
Activity occuring at a time is called
Concurrent activity
Serial activity
Successor activity
Both a and b