WorksheetsEE 529 Quiz 1(Module 1)
Total questions: 30
Worksheet time: 15mins
True or False:
Proper plan should be prepared before receiving heavy equipment at the site
True
False
What is the first step in "How to Safely Unload Heavy Equipment"?
Free the Load
Slowly Back the Heavy Equipment Down the Ramp
Do a Walk Through
Clear and Level the Unloading Site
What is the last step in "How to Safely Unload Heavy Equipment"?
Clear and Level the Unloading Site
Wrap It Up
Free the Load
Do a Walk Through
True or False:
The overall size of the equipment should be considered before unloading the heavy equipment:
True
False
True or False
The weight of the equipment is not a factor to be considered before unloading the heavy equipment.
True
False
The following points should be considered before unloading the heavy equipment:
Selection of proper lifting devices
Safety precautions while using lifting devices
Information of fragile parts and accessories of the equipments
all of the above
__________ of heavy equipment should be done immediately after it is unloaded
Installation
Storage
Inspection
Commissioning
A Comprehensive Inspection & Test Plans for Electrical Work might include the EQCP. What does EQCP means?
Electrical Quantity Control Process
Electrical Quality Control Procedure
Electrical Quality Control Planning
Electrical Quality Control Protocol
A Comprehensive Inspection & Test Plans for Electrical Work might include the Electrical ITP. What does ITP means?
Inspection And Test Protocol
Inspection And Test Procedure
Inspection And Test Process
Inspection And Test Plan
The equipment should be stored properly under these condition except for
Safety signages should be installed.
Direct sunlight should be present.
There should be proper ventilation at storage.
There should be proper pest control.
True or False
Chemical, batteries, gas cylinder, explosives can be kept in the same room where electrical equipment is stored.
True
False
Storage-The floor should not be subject to vibrations, however if it can’t be avoided, machine should be placed on __________________.
wooden blocks
rubber blocks
steel blocks
cement blocks
The foundation plan is usually recommended by the manufacturer. The foundation should be made of?
cement-concrete
wood
steel
galvanized iron
________ are required for machines, machine tools and heavy equipments which have wide range of speeds, loads and operating conditions. These are designed considering the shocks and vibrations (dynamic forces) resulting from operation of machines.
Machine insulation
Machine storage
Machine warehouse
Machine foundation
The following are the different types of foundations generally used for machines and equipment. Check all the possible answers
Block Type
Rigid Type
Box Type
Floor Type
Frame Type
_________ is a method or procedure by which shafts of machines such as motors and turbines are connected to a generator or pump.
Offset alignment
Angular alignment
Motor alignment
Shaft alignment
True or False
Aligning your machine does not affect the longevity & product quality.
True
False
_______ is a device used for lifting or lowering a load by means of a drum or lift-wheel around which rope or chain wraps. See photo.
crane
fork lift truck
hoist
power shovel
______ is a powered industrial truck with hydraulic lift system and forks to pick up and transport materials.
mobile crane
fork lift truck
power shovel
tower crane
Identify the tool shown.
Long Nose Plier
Linesman Plier
Channel Lock Plier
Side Cutting Plier
Identify the screwdriver shown.
flat blade screwdriver
Torx scredriver
Phillips screwdriver
Robertson screw driver
Identify the electrical tool shown.
fish tape
wire crimper
wire striper
tick tracer
True or False
An electrical transformer should be inspected for damage before installation.
True
False
True or False
Safety precautions and safety equipment for the construction worker handling the transformer is optional.
True
False
If the electrical transformer is installed at ground level, it is important to evaluate
soil characteristics
soil behavior
both a and b
neither a nor b
If the electrical transformer is to be installed over a concrete pad, it must have at least
1000 psi
3000 psi
2000 psi
4000 psi
If your electrical transformer is to be installed_______________, careful provisions and structural analysis of the load must be analyzed and considered for the integrity of the structural design.
outside of a building
on top of a building
in front of a building
at the back of the building
The following points should be checked while installing switchgear. Check all applicable choices.
Alignment of whole unit
Insulation resistance and drying out
Earthing connection
Assembly of the circuit breaker
Check the output voltage
The following points should be included in installation of induction motor. Check all the applicable options.
Assembly of the circuit breaker
Safety
Foundation and leveling
Alignment
Location
True or False
Testing and commissioning is done after the installation has been completed.
True
False