WorksheetsModule 4: Integrated Pollution Prevention and Control of Act
Total questions: 7
Worksheet time: 4mins
The main objective of Directive 2010/75/EU on Industrial Emissions is:
To achieve integrated prevention and control of pollution arising from activities listed in Annex 1.
To give permanent permits from activities listed in Annex 1.
To achieve integrated prevention and control of pollution arising from all the activities.
To give permits only to those activities with less environmental impacts.
What do we understand by Available Techniques?
Techniques developed on a scale which allows implementation in a relevant industrial sector.
Techniques developed on a scale which allows implementation in a relevant industrial sector, under economically and technically viable conditions.
Techniques developed on a scale which allows implementation in a relevant industrial sector, under environmentally and technically viable conditions.
Techniques developed on a scale which allows implementation in a relevant industrial sector, under economically, environmentally, and technically viable conditions.
A Best Available Technique is the ______ way to perform an activity, considering the ________, location and local conditions.
Environmentally friendly, cost
Quickest, cost
Environmentally friendly, time
Quickest, environment
Emission Limit Values (ELV) are the emissions generated when using a Best Available Technique (BAT).
True
False
The Commission should update BAT reference documents not later than how many years after the publication of the previous version?
There is no limit
2 years
8 years
50 years
The old Spanish Regulation of 2414/1961 classified the activities based on the type of problem they caused. Which of them was NOT directly considered?
Annoying
Unhealthy
Dangerous
Pollutant
Which of these steps are part of the procedure described in the Spanish Law 1/2016 on Integrated Pollution Prevention and Control?
Request of Environmental Impact Statement, if any, resolution.
Consultation of stakeholders.
Publication of binding reports.
All of them are true.
